TITLE:
An Experimental Study for Construction of Emergency Spillway in Daechung Dam
AUTHORS:
Hongkoo Yeo, Joongu Kang, Sanghwa Jung
KEYWORDS:
Hydraulic Model; Emergency Spillway; Energy Dissipater; Design Conditions
JOURNAL NAME:
Engineering,
Vol.4 No.9,
September
28,
2012
ABSTRACT: Recently, the flood frequently happened by several effects, such as El Nino et al., is the meteorological accident to attack the stability of dam. Hence, it was necessary to increase the stability of existing dam and dam design criteria were reinforced with probable maximum flood. This study was conducted in order to install the emergency spillway in Daechung Dam. Daechung Dam is located in the upper course of Guem River, in the middle of Korea, near a Sobak mountain range. The stream length and area of Daechung Dam are each about 401 km, about 9886 km2. According to the Report of new training project in Daechung Dam published in 2004 year, Maximum flood water level of Daechung Dam was calculated EL. 84.18 m increased of previous maximum flood water level (EL. 83 m). The aim of this study is to make an alternative plan on problems predicted by analysis of experimental data which is the results on the hydraulic model on dam structures. Analysis of experimental results was classified dam structures, such as approach channel, spillway, energy dissipater and stream, by design conditions.