Select Journal AA AAD AAR AASoci AAST ABB ABC ABCR ACES ACS ACT AD ADR AE AER AHS AID AiM AIT AJAC AJC AJCC AJCM AJIBM AJMB AJOR AJPS ALAMT ALC ALS AM AMI AMPC ANP APD APE APM ARS ARSci AS ASM BLR CC CE CellBio ChnStd CM CMB CN CRCM CS CSTA CUS CWEEE Detection EMAE ENG EPE ETSN FMAR FNS GEP GIS GM Graphene GSC Health IB ICA IIM IJAA IJAMSC IJCCE IJCM IJCNS IJG IJIDS IJIS IJMNTA IJMPCERO IJNM IJOC IJOHNS InfraMatics JACEN JAMP JASMI JBBS JBCPR JBiSE JBM JBNB JBPC JCC JCDSA JCPT JCT JDAIP JDM JEAS JECTC JEMAA JEP JFCMV JFRM JGIS JHEPGC JHRSS JIBTVA JILSA JIS JMF JMGBND JMMCE JMP JPEE JQIS JSBS JSEA JSEMAT JSIP JSS JSSM JST JTR JTST JTTs JWARP LCE MC ME MI MME MNSMS MPS MR MRC MRI MSA MSCE NJGC NM NR NS OALib OALibJ ODEM OJA OJAB OJAcct OJAnes OJAP OJApo OJAppS OJAPr OJAS OJBD OJBIPHY OJBM OJC OJCB OJCD OJCE OJCM OJD OJDer OJDM OJE OJEE OJEM OJEMD OJEpi OJER OJF OJFD OJG OJGas OJGen OJI OJIC OJIM OJINM OJL OJM OJMC OJMetal OJMH OJMI OJMIP OJML OJMM OJMN OJMP OJMS OJMSi OJN OJNeph OJO OJOG OJOGas OJOp OJOph OJOPM OJOTS OJPathology OJPC OJPChem OJPed OJPM OJPP OJPS OJPsych OJRA OJRad OJRD OJRM OJS OJSS OJSST OJST OJSTA OJTR OJTS OJU OJVM OPJ POS PP PST PSYCH SAR SCD SGRE SM SN SNL Soft SS TEL TI UOAJ VP WET WJA WJCD WJCMP WJCS WJET WJM WJNS WJNSE WJNST WJV WSN YM
More>>
A. S. Faridi and S. M. EL-Sayegh, “Significant Factors Causing Delay in the UAE Construction Industry,” Construction Management and Economics, Vol. 24, No. 11, 2006, pp. 1167-1176. doi:10.1080/01446190600827033
has been cited by the following article:
TITLE: The Design of Cost Estimating Model of Construction Project: Application and Simulation
AUTHORS: Abdelhak Challal, Mohamed Tkiouat
KEYWORDS: Estimation; Cost; Project; Construction; Methods; Model
JOURNAL NAME: Open Journal of Accounting, Vol.1 No.1, July 24, 2012
ABSTRACT: Construction projects are encountered with serious risks in the completion of the project. One of these risks is the inaccuracy of cost estimate; the project is carried out under conditions of uncertainty, it is whether the over- or underestimate of construction works. This is due to inadequate knowledge of current existing costs, so it leads to a set of difficulties hindering, the smooth progress of the project. Hence, it arises the need to set out a cost estimating model in line with major studies made locally and internationally in terms of estimating methods and a common relationships between various expenses so that the cost estimate would be more realistic.
Related Articles:
Effective Regulation and Level of Awareness: An Exposé of the Nigeria’s Construction Industry
Ikechukwu A. Diugwu, Dorothy L. Baba, Ashem E. Egila
DOI: 10.4236/ojsst.2012.24018 7,371 Downloads 14,732 Views Citations
Pub. Date: December 19, 2012
A Study on Construction of Division System in China’s Travel Agency Industry
Yufeng Yong
DOI: 10.4236/jssm.2017.105035 850 Downloads 1,257 Views Citations
Pub. Date: October 31, 2017
Motivational Strategies to Improve Artisan’s Productivity in the Construction Industry in Ghana
Timothy Adu Gyamfi, Edward Nana-Addy, Wiliam Gyadu-Asiedu
DOI: 10.4236/jbcpr.2020.84019 93 Downloads 219 Views Citations
Pub. Date: December 30, 2020
Quantification of the Influence of Factors Causing Time and Cost Overruns in Tanzanian Construction Projects
Daniela Daniel Ndunguru, Ferdinand Niyonyungu, Xiangfei Yang
DOI: 10.4236/ojbm.2020.85130 1,460 Downloads 2,074 Views Citations
Pub. Date: September 4, 2020
Microclimatic Factors Effect on Productivity of Construction Industry
Hatim A. Rashid
DOI: 10.4236/ojce.2014.42015 5,009 Downloads 6,484 Views Citations
Pub. Date: June 27, 2014