[1]
|
Y. S. Gong, “Research of Over-voltages of Electric Locomotive Passing the Articulated Phase Insulator,” Journal of the China Railway Society, Vol. 30, No. 4, 2008, pp. 103-107.
|
[2]
|
X. Y. Zhang, “Research on Overvoltage Mechanism and Prevention in the Network-Locomotive Coupling of the High Speed and Heavy Haul Railways,” ChengDu:South West JiaoTong University, 2009.
|
[3]
|
Y. S. Li, “Machanism Analysis on the Overvoltage of Articulated Phase Insulator,” ChengDu: South West JiaoTong University, 2008.
|
[4]
|
F. L. Zhou, Q. Z. Li, J. M. He, ect. “Research on Simulation, Practical Measurement and Mechanism of Locomotive Over-voltage and Passing Neutral-section Based on Probability,” Electric Drive for Locomotives, Vol. 6, 2008, pp. 13-16.
|
[5]
|
Z. Y. He, H. T. Hu, L. Fang, ect. “Research on the Harmonic in High-speed Railway Traction Power Supply System and Its Transmission Characteristic,” Proceedings of the CSEE, 2011,Vol. 31,No. 16, pp. 55-62.
|
[6]
|
Y. J. Liu, G. W. Chang, H. M. Huang. “Mayr’s Equation-Based Model for Pantograph Arcof High-Speed Railway Traction System,” IEEE Transactions on Power Delivery, Vol. 25, No. 3, 2010, pp. 2025-2027.
doi:10.1109/TPWRD.2009.2037521
|
[7]
|
D. Ma, “Analysis of Over-voltage Transient State Process of De-energized Passage of Neutral Section Insulator,” ChengDu: South West JiaoTong University, 2008.
|
[8]
|
G. J. Li, X. Y. Feng, L. J. Wang, ect. “Research and Simulation on Auto-Passing Phase Separation Control Strategy of High-Speed EMU,” Transactions of China Electrotech-nical Society, 2007, Vol. 22, No. 7, pp. 181-185.
|
[9]
|
J. M. Wen, B. T. Wang, Z. J. Fang, “Research and Using on Auto-Passing Phase Separation Control Strategy of High-Speed EMU,” Railway Standard Design, 2011, Vol. 4, pp. 104-108.
|
[10]
|
W. Q. Sun, S. X. Shan and G. F. Zheng, “Comparison between Home and Aboad of Automatic Passing Over of Neutral Section Device,” Electric Raileay, 2002, Vol. 2, pp. 12-16.
|
[11]
|
X. F. Ao, S. B. Liu, “Train Carried Automatic Conversion System for Passing through the OCS Phase Break,” Electric Railway, 2006, Vol. 2, pp. 5-10.
|
[12]
|
N. Li, “Research on Electromagnetic Transient Process of Electric Locomotive System,” Beijing: Beijing Jiaotong un-iverisity, 2010.
|
[13]
|
X. Yan, “A Few Questions about Auto-Passing Phase Separation on Locomotives,” Electric Drive For Locomotives, 2004, Vol. 2, pp. 66-68.
|
[14]
|
X. L. Qin, “Electric Locomotive Passing Articulated Phase Insulator Overvoltage Analysis and Protection,” Beijing: Beijing Jiaotong univerisity, 2007.
|
[15]
|
G. J. Li, X. Y. Feng, L. J. Wang, ect. “Research and Simulation on Auto-Passing Phase Separation Control Strategy of High-Speed EMU,” Transactions of China Electrotechnical Society, 2007, Vol. 22, No. 7, pp. 181-185.
|
[16]
|
Z. G. Fang, “Application of Transient Over-voltage Suppression Technique for EMU Auto-passing the Neutral Section with On-board Switch Closed,” Railway Technical Innovation, 2010, Vol. 1, pp. 44-46.
|