Design of a Co-Digestion Biogas Plant to Curb Deforestation-Case Study of Phalombe Secondary School in Malawi ()
1. Introduction
Biogas has been used in most parts of the world for cooking, heating, and lighting. In Africa, countries such as Kenya, Uganda, Ethiopia, Tanzania, Rwanda, Cameroon, Burkina Faso, and Benin have benefited from this technology through National Biogas programs initiated by their governments [1]. In Malawi, little has been done to promote this technology. Since access to electricity is still very low (10.8% in 2018 and projected to 12.7% in 2020) [2] [3]. Malawi’s main source of energy for cooking is firewood. Over 90% of the population in Malawi is heavily reliant on firewood as their primary source of energy for cooking. Most boarding secondary schools in Malawi depend on firewood as their main source of energy for cooking and heating water. This results in deforestation, pollution of the environment, and great monetary expenditure to buy firewood, more especially by boarding schools. Moreover, this places a financial burden on these schools due to the ever-increasing prices of firewood. One amongst such schools is Phalombe Boarding Secondary School. It is against this background that it was proposed to design a co-digestion biogas plant for use at Phalombe Boarding Secondary School. To generate more biogas, the temperature in the biodigester must be increased [4]. Methane-producing bacteria will operate most efficiently if temperatures in the biodigester are in the range of 30˚C - 40˚C for the mesophilic bacterial activity and 50˚C - 60˚C for the thermophilic bacterial activity [5]. The thermophilic temperature is responsible for methane production and is reached after a longer HRT (40 - 60 days). A longer HRT is favourable for the production of more methane gas than a shorter HRT which produces more hydrogen gas than methane [6]. A pH of 7.8 to 8.2 is preferred for methanogenic bacteria to digest the waste for the production of methane gas [7]. It is against this background that the simulation used a temperature of 55˚C and pH of 7.8 (neutral) to calculate biogas production.
Phalombe district is located in a moderate to hot zone which has very good weather conditions for biogas production. Its monthly temperatures ranging from 25˚C to 28˚C but temperatures of more than 30˚C are obtained in the hot summer season. The school enrolls 562 students and has around 195 members of staff including their dependents. This brings to a total number of 757 people. This number of people is enough to produce the human waste (HW) necessary to sustain the project. Furthermore, there are always a lot of food leftovers at the students’ canteen which can be used to co-digest with HW. The school is surrounded by three villages that are engaged in agricultural activities such as cattle and rice farming; from which we can also obtain daily feeding materials for this biogas plant. This biogas plant will use HW and canteen food wastes (CFW). To supplement these daily feeding materials, it will also use cow manure and agricultural wastes such as rice bran from the surrounding villages. Once the plant is installed at the school, it will curb deforestation and reduce the amount of money the school spends on cooking and lighting. Biogas offers a great alternative for fuel for cooking, heating, and lighting. It also addresses the issues of HW disposal [8]. It reduces the impacts on the environment which are mostly caused by deforestation and greenhouse gas emissions into the atmosphere. Biogas is a combustible mixture of gases that primarily consists of Methane (CH4), Carbon dioxide (CO2), and other trace elements [9] [10]. These gases are produced from the decomposition of organic wastes through anaerobic digestion (AD) [11]. There are several designs of biogas plants across the world and the designs depend on geographical location, availability of substrate, and climatic conditions [12]. Some biogas plants are fixed underground while others are constructed above the ground. Out of the different biogas digesters, the fixed dome model developed by China and the floating drum model developed by India has continued to perform well until today [1] [13].
The size of the digesters depends on the location, the number of households, and the amount of substrate available every day. Biogas plant models can be modified to suit the conditions of Malawi and Phalombe Secondary School in particular. This research is therefore aimed at seeking to modify the available performing biogas designs in Malawi that only use one type of substrate for digestion. The designed biogas plant will make use of HW and CFW to co-digest them to produce biogas for cooking and lighting at the school to replace firewood. Mzuzu University in Malawi under the faculty of Renewable Energy has been implementing fixed dome biogas projects in rural areas of Malawi using sing digestion to preserve the carbon sink and switch to a cleaner and more efficient alternative to firewood. One of the beneficiaries of this project is Ruguwa Mhlanga Village, a rural village North East of Mzuzu [1]. Similarly, tubular polyethylene biogas digesters have been developed and tested in Zomba in Malawi by the Swedish University of Agricultural Sciences in conjunction with the University of Malawi (Chancellor College) to cut back deforestation and support global climate change mitigation and adaptation. Waste management and agricultural productivity can even be improved as a result of biogas technology. Further, the event and promotion of biogas within the energy sector can propel the establishment of the latest enterprises thereby creating a full range of opportunities for jobs and tiny and medium enterprises both in urban and rural areas [13].
With all the advantages above in mind, the construction of a biogas plant at Phalombe Boarding Secondary School will be very vital. The biogas plant will use HW from school toilets and CFW from student’s canteen as feedstock (substrate) for co-digestion. The biogas plants that are currently in use in Malawi use single digestion (only one type of feedstock). This research study aims at addressing this gap by introducing co-digestion. To supplement the feedstock, it will also be using animal manure and crop residues such as rice straw/bran from the surrounding communities. Phalombe is one of the highest rice-producing districts in Malawi but does not make use of rice bran after rice milling. Millions of tons of rice bran are not used and are either burned into ashes or just thrown away. The district is also engaged in animal farming which includes goats, cows, and pigs. From these farm animals, farm manure can be collected and used as a daily feeding material/feedstock for the biogas plant. Therefore, the general objective of this study is to design an affordable co-digestion biogas plant for use at Phalombe Secondary School in Malawi.
2. Materials and Methods
This study was carried out at Phalombe Secondary school. The school is 1 km away from the central district of Phalombe and is situated 0.5 km away from Michesi Hill Forest which is the other source of firewood for the school’s kitchen activities. The researcher engaged the school head and its members of staff to come up with the total energy demand (TED) at the school. The researcher also engaged village heads to establish the availability of livestock that would provide daily feeding material (substrate) for the biodigester at the school to supplement the already available daily feeding material at the school. The village heads engaged were Mbodi, Bokosi, and Seven. Also interviewed were owners of rice mills around Phalombe Secondary School who could provide rice husks/bran for free to be used for co-digestion.
2.1. Data Collection Methods
The data collection has been done through various methods including literature reviews concerning biogas plant designs and biogas production using different biodegradable wastes either as a single substrate or co-digested with other wastes, questionnaires, interviews, and observation. Primary data was collected through a baseline survey that included a questionnaire and personal observations in and around Phalombe secondary school where the study was carried out.
Secondary data was collected through literature reviews that included books, journals/articles, and websites. Data gathered from the literature review was used to determine the type of biogas plantto be used at Phalombe Secondary School. The Floating drum, Fixed dome, and the Polythene tube biodigester are three main digesters used worldwide. Each type of the three biogas plants mentioned above was thoroughly evaluated and the best design suitable for use at Phalombe Secondary school was selected using the Ranking method. Data for daily feeding material (DFM) was collected from both surrounding households and the administrator of the school. Also collected were data on the number of times of cooking per day at the school, number of staff and students at the school, disposal of kitchen waste, and annual temperatures of Phalombe district. All this data was required to come up with an appropriate design of a biogas plant that could supply Phalombe Secondary School with the right amount of gas for cooking and lighting. Other design considerations were based on the hydraulic retention time (HRT) and total solids (TS) content in the manures. From the literature review, the TS value desired is 8% and HRT is greater than 20 days. From this information, a TS value of 8% and HRT of 40 days was used in the design calculations for the biogas plant to be constructed at Phalombe Secondary School.
2.2. Energy Demand Assessment
The energy demand assessment has been done through a questionnaire, interviews, and site visit, therefore, data for energy demand (ED) for cooking and lighting was also collected. This helped to know how much electrical energy (EE) per day was being used by the school for lighting in the school classrooms, staff houses, kitchen, laboratories, and hostels. Also collected were data on the amount of firewood the school was using per school term. The electrical energy demand (EED) and the ED for firewood were then summed up and converted into biogas equivalence. It was from this sum of ED that the calculations for the size of the biogas plant were based. The respondents of the questionnaire on EED at the school for lighting were the head teacher of the school and other members of staff on duty during evening study times at the school. On the demand for firewood, the respondent of the questionnaire was the head cook. The respondents for ED for lighting at staff houses of the school were the head teacher and his fellow members of staff who are housed in the school compound.
The EED requirement was based on EE used by the staff members for lighting in their houses, EE used in the classrooms and offices for lighting during study times, EE used in the laboratories, student hostels, student kitchen, dining hall/canteen, and storeroom where kitchen facilities are kept. The EED in kilowatt-hour (kWhr) was summed up and converted to ED in Joules per day. This was then being converted to biogas flow rate per day (m3 per day) as biogas equivalent from ED. Wood energy demand was calculated based on the amount of firewood the school is using in an academic term or year. This was then converted to the amount of firewood the school uses per day. Using the firewood to biogas-equivalent conversion, it came up with the amount of biogas in cubic meter (m3) required per day (m3 per day) for cooking in the kitchen as an alternative source of energy. The total amount of biogas required per day at the school for cooking and lighting was calculated by summing up the biogas equivalence for electrical lighting and firewood to biogas equivalent in m3 per day. Using the sum of biogas equivalence per day required at the school for cooking and lighting, the amount of HW required per day to be fed into the digester was determined. Based on the total amount of substrate to be fed into the biodigester (HW and CFW) and an estimated HRT of 40 days, the sizing of the biodigester, Gasometer, and the Digestate Collecting Tank was carried out. Detailed calculations are shown in the next section (section 2.5.3).
2.3. Selection of the Type of Biogas Plant
The tool used for this method was literature reviews on the common types of biogas plants in use globally for biogas production namely the Floating drum, Fixed dome, and the Polythene tube biodigester. The information of these types of biogas plants was gathered in terms of construction methods, availability of materials used in construction, the durability of materials, gas pressure holding ability, gas leakage through walls, gas pressure capacity, their life span, gas holding capacity, maintenance costs, their versatility in terms of construction(in high or low weather conditions), methane emission from each type, and other factors that should be considered when designing a biogas plant were sourced through this literature search. Each type of the three biogas plants mentioned above was thoroughly evaluated and the best design suitable for use at Phalombe Secondary school was selected. Based on literature detailed information about each of the three types of biogas plants, the fixed dome was selected [12] [14]. Although high skilled labor is required in the construction of a fixed dome biodigester, it has several advantages over the other types of biodigesters in AD [15]. Therefore, it was the preferred choice in the design selection. It consists of a digester with a fixed, non-movable gas holder that sits on top of the digester. When gas production starts, the slurry is displaced into the overflow tank. Gas pressure increases with the volume of the gas stored and the height of the difference between the slurry level in the digester and the slurry level in the compensation tank. There are no rusting steel parts in its construction hence long life (20 years or more). The plant is constructed underground, protecting it from physical damage and saving space. The underground digester is protected from low temperatures at night and cold seasons [12] [16].
2.4. Statistical Analyses of Results
A Biogas software called Online Biogas App (OBA) was used to simulate biogas production from the amount of substrate that was calculated/estimated in the design. The biogas yield was calculated from stoichiometry calculation, based on substrate compositions using OBA. Graphical presentations were drawn from the averaged results. All statistical work was done in Microsoft Excel 2016 (Microsoft Corporation, USA) and Past statistical software (version 4.03).
2.5. System Analysis and Design
2.5.1. Design of the Biogas Plant
Calculations for the sizing of the Biodigester tank, Gasometer, Digestate collection tank, and mixing tank were performed based on ED and available substrate at the school. These calculations were based on the fixed dome biogas plant which was selected as the best design suitable for use at Phalombe Secondary School. The information used in the design was taken from the following literature [12] [16] - [21].
2.5.2. Designing the Size of a Biogas Plant
All biogas plants have two useful parts that help to design the size of biogas plants. These parts are the digester which is the tank body and the gasometer which is commonly known as the dome. So for design calculations, these two main parts are considered. Other parts that have to be calculated are the sizing of the mixing tank and the digestate tank. The volume/size/capacity of a biogas plant depends on the HRT and the DFM. The DFM consists of organic biodegradable materials and water to be mixed with it. In this research, DFM includes HW, cow dung, FCW, and wastewater. Rice bran/straw was used for improving the C/N ratio of HW [8] [11]. Phalombe secondary school has an enrolment of 562 students and 195 members of the staff including their dependents. According to literature research, one adult human produces an average of 0.5 kg of HW [22]. For a simple biogas digester, the HRT is at least 40 days. But practical experience has shown that HRT can reach as far as 60 to 100 days if there is a shortage of daily feeding material. However, long HRT can increase the amount of gas produced by the biodigester by 40% of the initial production [23]. Since this study's main objective was to come up with a big plant required to produce a large quantity of biogas to satisfy the needs of the school, and HRT was to be estimated at 40 days (minimum).
2.5.3. Design Calculations
1) Energy demand calculations
To come up with the correct size of the biogas plant that can serve the two purposes of cooking and lighting at the school, detailed calculations were carried out to determine the ED at the school as follows:
a) Classroom demand (for studies)
Number of classrooms = 8.
Number of 22 watts (W) fluorescent bulbs per classroom = 2.
Lighting time (from 6 pm to 10 pm) = 4 hours (h).
Therefore, energy (E) required in kilowatt-hour (kWh) during study time
(1)
b) Laboratories
Biology, Physics, and Chemistry labs 2 × 22 W fluorescent tubes each.
Lighting time (from 6 pm to 10 pm) = 4 h
(2)
c) Student hostels
Number of hostels = 12.
Number of rooms per hostel = 10.
Each room uses 1 × 22 W fluorescent tube for 5 hours lighting (6 - 10 pm, 03:00-04:00 am). Therefore, the energy required in the student hostels, E is given by Equation (3)
(3)
Each hostel uses a 2 × 22 W security light (one inside and one outside).
Therefore, the energy required for security lighting at the hostels is given by Equation (4)
(4)
(5)
d) Staff houses
40 houses, 3 bulbs per house, 10 W with an average lighting period of 6 hours, E is given by Equation (6)
(6)
One security light of 22 W per house with a lighting period of 10 hours, E is given by Equation (7)
(7)
(8)
e) Students Kitchen
Energy required for 3 × 22 W fluorescent tubes for 6 hours lighting and 2 × 22 W fluorescent tubes security lights for 10 hours is calculated using Equation (9) and (10)
(9)
(10)
(11)
f) Dining Hall
The energy required for 8 × 22 W fluorescent tubes for 2 hours is calculated as follow (12)
(12)
g) Storeroom
The energy required for a 1 × 22 W fluorescent tube for 6 hours is given by Equation (13)
(13)
The total lighting energy required per day is summarized in Table 1.
2) Energy conversion
(14)
Therefore,
(15)
According to [14], a mixture of human and kitchen waste produce 0.15 m3 per kg of biogas.
Assuming that this is possible with an HRT of 40 days as per the researcher’s design and using the calorific value of biogas is 20 MJ per m3 (MJ: megajoule), then the daily biogas flow rate can be calculated as follows:
(16)
3) Firewood to biogas equivalent
Phalombe Secondary School uses 52 tons of firewood in a school calendar. The school runs on three terms of 12 weeks each on average. 12 weeks is equal to 84 days.
Therefore, the number of tons of firewood required per day is given by Equation (17)
(17)
but
(18)
Therefore, 0.206 ton per day = 1000 × 0.206 kg per day = 206 kg per day.
Table 1. Summary of energy demand at phalombe boarding secondary school.
According to Biogas Digest Volume III, Biogas applications and product development, biogas costs and benefits, ISAT, GTZ [24].
(19)
So if
(20)
Therefore, 206 kg of firewood = 1 × 2065.5 m3 of biogas = 37.45 m3 per day.
Therefore, the total amount of biogas (Y) required at Phalombe Secondary School for lighting and cooking is calculated using Equation (21)
(21)
The quantity of HW (QHW) required is given by the amount of gas produced per day over gas production per kg from HW [25].
(22)
With the number of people at Phalombe secondary being 757 and on average a human being produces 0.5 kg of HW, we expect the amount of HW produced in a day to be
(23)
This amount of HW exceeds the requirement per day. Therefore, Phalombe Secondary School has enough HW to supply the digester to be constructed at the school.
From this organic material (ORM) will be added CFW of 60 kg per day, therefore,
(24)
Add 1:1 ratio of ORM to Water becomes
(25)
And according to [18], TS = 16% of the mass of substrate
(26)
Quantity (Q) of the substrate is given by Equation (27)
(27)
Therefore, the required Q = 110.72/0.08 kg per day = 1384 kg per day.
2.5.4. Sizing of the Digester, Gasometer, Digestate Collection Tank, and Mixing Tank
1) Sizing of the Digester
Given Q = 1384 kg per day, HRT = 40 days and density of slurry = 1000 kg per m3.
The operating volume of the digester (V0) is calculated using Equation (28),
(28)
But V0 = 90% of VT where VT is the total volume of the digester [25].
Therefore
According to [18], the height of a digester is 4 times its radius (r) i.e. h = 4r, but
(29)
(30)
Diameter of the digester becomes
Height of the digester becomes
2) Sizing the Gasometer
According to [15] the volume of biogas from cow dung per kg = 0.000616 m3. According to [26] biogas yields (m3 per kg daily solids) for cow manure and HW are 0.3 and 0.4 respectively. The difference between the two yields is very small. The yield from HW will be improved by the addition of CFW as per the researcher’s design of the biogas plant. For this reason, a value of 0.000616 m3 is used to calculate the volume Vg of the gasometer as follows:
(31)
where Volume of biogas per day = 0.000616 m3, DFM = 692 kg per day and HRT = 40 days, then
An allowance of 10% is given.
Therefore,
(32)
In practice, the ratio Vg:V0 where V0 is the operating volume of the digester, which is commonly used is between 1:3 and 1:5 [18] [27] [28]. According to this design, the ratio is 18.76:55.36 = 1:3, so the design is feasible.
Taking the height, the gasometer to be 4 times its radius, the diameter, and height of the gasometer can be calculated as follows:
where
(33)
(34)
3) Sizing the Digestate collection Tank (Overflow tank)
The Digestate tank can take the shape of a rectangle, square, or circle. For the digestate collection tank, a 10% allowance is given for mixing.
a) Circular tank sizing
The volume of collection tank (Vc),
(35)
The height of the tank is 1.5 times its radius [18], but
(36)
Therefore,
(37)
b) For a square base tank, the volume (V) will remain the same i.e. 60.89 m3 and height of 5.0 m
(38)
Therefore,
4) Sizing mixing tank for kitchen wastes/agriculture waste/cow dung
Since the tank will be accommodating 60 kg of kitchen wastes per time, the following dimensions have been suggested to be reasonable:
Depth of mixing tank = 1.0 m
The diameter of mixing tank = 0.9 m
(39)
Table 2 shows a summary of the sizing of the designed Fixed Dome Biogas plant.
2.5.5. Development of a Detailed Biogas Plant Drawing
Detailed drawings were produced to be used by the masonry builders when constructing the biogas plant. A computer-aided design (Auto CAD) software was used for the drawing biogas plant layout out Phalombe Boarding Secondary School as shown in Figure 1 while Figure 2 was sourced from Rwandan Standards Board. This is the standard fixed dome biogas plant that is used worldwide. The major dimensions in Table 3 are from the calculations in the sizing of the Digester tank, Gasometer, Digestate tank, and the Mixing tank.
The detail drawing in Figure 2 will be used by the masonry builders to construct a biogas plant at Phalombe Secondary School. The Mixing and Biodigester (digester) tanks are cylindrical while the Digestate tank is square.
Figure 2. Detail drawing of fixed dome biogas plant. Source: [16] [27] [28].
Table 2. Summary of sizing of the fixed dome biogas plant.
Table 3. Major dimensions of the fixed dome biogas plant.
2.5.6. Design Cost Estimates
The size of the designed biogas plant was used to estimate the cost of building this biogas plant at the school. The costs of using firewood for cooking and electricity for lighting at the school were compared with that of building the designed biogas plant. Bills of quantities for the sized biogas plant were used to come up with the cost of constructing the biogas plant at the school. The bill of quantities for the 62 m3 biogas digester is shown in Table 4. Exchange rate: MK800 = US$1.
2.5.7. Simulation of Biogas Production Using Quantities of the Substrate in the Design
A Biogas software called Online Biogas App (OBA) was used to simulate biogas production from the amount of substrate that was calculated in the design. Three biogas production simulations were run (Figures 3-5) using:
1) HW only as a substrate
2) CFW only as a substrate and
3) Co-digestion of HW and CFW
The results for each simulation were then analyzed.
1) Design Simulation
This design simulation was based on the type of biomass, amount of biomass, the molecular composition of the biomass, PH in the biodigester, and the temperature required for methane gas production. This Biogas Simulation software was written and developed by [29] with assistance from Jon Katz.
Table 4. Bill of quantities for a 62 m3 biodigester.
NA: not applicable, Qty: quantity, $: USA dollar, MK: Malawian Kwacha, G.I: Galvanized Iron.
2) Inputs and outputs for OBA simulation Software
The inputs for this simulation process are as follows:
a) Substrate composition (%)
b) Mass of the substrate (kg)
c) Substrate biodegradability (%DM)
d) Substrate partitioning to cell synthesis (%)
e) Reactor pH and
f) Reactor temperature (˚C)
The outputs are as follows:
a) Methane production
b) Carbon dioxide production
c) Nitrogen production and other impurities
d) Total Biogas production
This biogas plant uses HW as well as CFW as biomass material for feeding the biodigester. The parameters for each type of biomass are tabulated in Table 5.
Table 5. Parameters for simulation of biogas production.
3) Results of simulation
a) Simulation of biogas production from HW
The amount of HW whose mass was 286 kg as the amount of organic material in the design was used as input into the digester. The macromolecular composition (%DM) of the HW was 11% carbohydrate, 3% protein, 15% lipids, and 15% ash (Figure 3). Since HW are highly biodegradable, the substrate degradability was at 90%. The digester pH was 7.5 with a mesophilic temperature of 55˚C. Figure 3 shows the results of theoretical gas production using HW.
b) Simulation of biogas production from CFW
The amount of CFW whose mass was 60 kg as the amount of organic material in the design was used as input into the digester. The macromolecular composition (%DM) of the CFW was 45% carbohydrate, 15% protein. 40% lipids, and 0% ash (Figure 4). Since CFW are highly biodegradable, the substrate degradability was at 90%. The reactor pH was 7.5 with a mesophilic temperature of 55˚C. Figure 4 shows the results of theoretical gas production using CFW.
c) Simulation of biogas production using co-digestion of HW and CFW
The amount of CFW whose mass was 60 kg was mixed with 286 kg of HW making a total co-digestion substrate of 346 kg as amount of organic material in the design was used as input into the digester. The macromolecular composition of the mixture was 56% carbohydrate, 18% protein, 30% lipids, and 15% ash. Since both HW and CFW are highly biodegradable, the substrate degradability was estimated at 90%. The reactor pH was 7.5 with a mesophilic temperature of 55˚C. Figure 5 shows the results of theoretical gas production using co-digestion of HW and CFW.
Figure 3. Theoretical biogas production from HW.
Figure 4. Theoretical biogas production from CFW.
Figure 5. Theoretical biogas production from co-digestion of HW and CFW.
3. Results and Discussions
This section presents the results of the design including simulation of biogas production, comparison of the results with existing literature, discussion of the feasibility of the design, cost comparison between the design, and the continued use of firewood as the source of energy for cooking at Phalombe Secondary School. Thestudy design was based on the use of HW and CFW as the substrate for the biodigester to produce methane gas that could be used for cooking and lighting at Phalombe Secondary School to replace firewood. With a school population of 757 people, design calculations/estimations were performed to find out the amount of HW required per day. The design came up with an amount of HW as 286 kg per day. An estimated 60 kg of CFW per day was used, making a total ORM of 346 kg per day. These wastes were co-digested for biogas production. Based on the ED at the school, a 61 m3 biogas plant that could co-digest these wastes was designed using theories from the literature [18] [19] [20] [21] [30] [31].
3.1. Simulation of the Design
Using HW and CFW separately as substrates and then using the mixture as substrate simulations were run (Figures 3-5). The results were as follows Simulation 1: Theoretical biogas production from HW, Simulation 2: Theoretical biogas production from CFW, and Simulation 3: Theoretical biogas production from co-digestion of HW and CFW as shown in Table 6, Table 7, and Table 8 respectively.
Table 6. Results of Simulation 1 from HW.
Table 7. Results of Simulation 2 from CFW.
Table 8. Results of Simulation 3 from co-digestion of HW and CFW.
As described from the above tables, in simulation 1, the macromolecular composition of HW is 11%, 15%, 15%, and 3% for carbohydrates, Ash, Lipids, and Protein respectively. The total volume of biogas produced was 185,000 L per kg (185 m3 per kg) from which the amount of CH4 produced was 118,000 L per kg (118 m3 per kg) representing 64% CH4 from the total biogas produced. The amount of CO2 produced was 66,400 L per kg (66.4 m3 per kg) representing 35.9% of the total gas produced. In simulation 2, the macromolecular composition of CFW is 45%, 0%, 40%, and 15% for carbohydrates, Ash, Lipids, and Protein respectively. The total volume of biogas produced was 58,900 L per kg (58.9 m3 per kg) from which the amount of CH4 produced was 36,300 L per kg (36.3 m3 per kg) representing 61.6% CH4 from the total gas produced. The amount of CO2 produced was 22,600 L per kg (22.6 m3 per kg) representing 38.4% of the total biogas produced. In simulation 3, the macromolecular composition of the mixture was 56%, 15%, 30%, and 18% for carbohydrates, Ash, Lipids, and Protein respectively. The biogas production from co-digestion was high compared to HW and CFW digestion alone. However, the %CH4 was low compared to them. The total volume of biogas produced was 265,000 L per kg (265 m3 per kg) from which the amount of CH4 produced was 157,000 L per kg (157 m3 per kg) representing 59% CH4 from the total gas produced. The amount of CO2 produced was 109,000 L per kg (109 m3 per kg) representing 41% of the total biogas produced. All digesters presented high degradability with 90%.
3.2. Graphical Presentation and Analysis of the Results
Figure 6 and Figure 7 show pie charts and bar charts for the mole fraction of methane in dry biogas produced from co-digestion of HW and CFW.
The two graphs above show that single digestion of HW and CFW gives results of 64% and 61.6% respectively. When the two types of wastes are co-digested, they also give a fairly good result of 59%; a figure which is within the bracket of 55% - 65% CH4 composition [30] [32]. From the simulation results 1 and 2, it can be seen that both substrates (HW and CFW) have the potential of producing enough biogas, with gas constituent compositions well comparable [33] [34]. Similarly, if the two substrates are co-digested, it can also be seen that enough CH4 is well comparable to the constituent compositions presented by [32] [35].
Figure 6. Bar chart showing Mole fraction of Methane in dry biogas.
Figure 7. Pie chart showing Mole fraction of Methane in dry biogas.
The study [36] reported that the quantity and quality of biogas produced from biodegradable wastes largely depend on the nature and composition of the digester feedstock, temperature, organic loading rate, HRT, and C/N ratio. Proper management of the production process is also of great importance. This simulation exercise did not show the C/N ratio. In general, anaerobic microbes utilize carbon 25 - 30 times faster than nitrogen. So for efficient biogas production, the C/N ratio in the feedstock should be maintained at 20 - 30:1 [9] [37] [38]. This is the optimal value that can give out enough CH4 gas. However, the designer of this study will use rice straw/bran to improve the C/N ratio during the anaerobic co-digestion of these wastes. Plants such as rice straw have a high percentage of carbon. For example, rice straw has a C/N ratio of 70:1 [39] such that it can be mixed with materials of low C/N ratio such as HW to maintain this optimum C/N ratio thereby increasing the CH4 yield.
In the study of co-digestion of food waste and human excreta for biogas production [40], the value of biogas generated from a 40-liter laboratory-scale AD was 84,750 cm3 (0.08475 m3) comprising 58% CH4 and 24% CO2 with a mesophilic temperature range of 22˚C - 30.5˚C throughout the study. The simulated results of this design study obtained a CH4 value of 59% which is slightly higher than what was found in this laboratory experiment. However, it was argued that if a higher temperature, in this case, 50˚C - 60˚C was reached during the AD process a higher percentage value of CH4 yield would have been maintained because methane methanogenic bacteria which is responsible for CH4 production work efficiently at a mesophilic temperature of 30˚C - 40˚C and thermophilic temperature of 50˚C - 60˚C.
The study suggested the temperature of below 30˚C slowed the development of methanogenic bacteria responsible for CH4 production, hence low yield. In the study of [41] which was done to find out the yield of CH4 when fruit vegetable waste and food wastes were digested separately in anaerobic conditions, methane yields for fruit vegetable waste and food waste in m3 per kg-VS were 35% and 60% respectively. This shows that there is potential in food wastes for CH4 production. The results are also very comparable with the value obtained through simulation of biogas production in CFW (61.6%). A study of [42] reported that with a proper organic loading rate into the biodigester, the highest CH4 production yield was 64%. Therefore, the simulation results of this design agree with those of this study. In the study of [18], a biodigester of volume 2.5 m3, gasometer volume of 0.7 m3, and digestate volume of 2.5 m3 were designed. With an HRT of 30 days, the total gas produced was 0.6108 m3, with maximum gas production of 0.037 m3 per day while the maximum biogas potential was 0.771 m3. This study has designed a biogas of volume 62 m3. Mathematically it can be proved that if a 2.5 m3 biodigester produces 0.037 m3 per day of biogas, then a 61 m3 biodigester will produce
(40)
We can assume that with an HRT of 40 days as per this design, the volume of biogas produced in the digester will be more than 0.9176 m3 per day. Taking this value of 0.9176 m3 per day of biogas production, it means that to satisfy the demand of biogas at Phalombe secondary school which is currently at 42.85 m3 per day as per the researcher’s calculations, then this demand will be met within 47 days. But this is when the HRT is 30 days. Therefore, with an HRT of 40 days as per this design and the addition of rice straw to the substrate to improve the C/N ratio, then the demand can be met in less than 47 days. Therefore, this is a viable design. It must also be mentioned here that proper management of the whole biogas production process is very vital to achieve good results. Table 9 shows standard sizes (models) of fixed dome biogas plants used in Bangladesh.
According to Table 9 from these articles, we can compare the effective digester volumes and their respective rated biogas production with the new design. It can be seen that if a digester of volume 11.8 m3 produces 4.8 m3 of biogas per day, then from the new design of 62 m3 digester we can get:
(41)
The energy demand at Phalombe Boarding School is found to be 42.85 m3 per day. So at the rate of 25.2 m3 per day of biogas, this demand can be meet within a very short period.
3.3. Use of Conversion Factors for Biogas
If we use conversion factors in Figure 8 we can calculate CH4 production from the biogas energy demand in this design.
From the table in Figure 8, 1 m3 of biogas = 0.65 m3 of CH4. Therefore the 25.2 m3 per day of biogas, CH4 produced will be 0.65 m3 × 25.2 m3 per day = 16.38 m3 per day
From this value, it can be assumed that meeting the demand of 42.85 m3 per day can be achieved in 3 days after the HRT which in this design is 40 days. A study [45] proved that the best HRT is below 44 days because after this day biogas production becomes stable for some time and then drops. Also, studies [23] [25] showed the same effect of HRT. So, an HRT of 40 days for this design is a good time for digestion since by the time this day is reached production of biogas will be at its peak and the yield will be stable from the 44th day.Using the value of 25.2 m3 per day of dry biogas, the Mole fraction of CH4 in dry biogas can be calculated as follows:
Amount of dry biogas production per day = 25.2 m3.
Amount of Methane production per day = 16.38 m3.
Then the Mole fraction of CH4 in dry biogas will be (16.38 ÷ 25.2) × 100% = 65%.
This value of the mole fraction of CH4 is approximately the same as the values found in the simulation results. Therefore, the volume of this biogas plant designed in this study will be able to meet energy demand at Phalombe Boarding Secondary school.
Table 9. Standard sizes of fixed dome biogas plants used in Bangladesh.
Source: study Article [43] [44].
Figure 8. Conversion factors for Biogas [43].
3.4. Economic Viability of the Design
Initial investment costs for a fixed dome biogas digester may seem to be high. However, it has more advantages than the other types of biogas plants namely. The amount of firewood used by Phalombe Secondary school per term is 60 tons. In three terms it uses 180 tons of firewood. One ton costs US$16.67. Therefore 180 tons cost US$3000. The school spends US$344 on electricity per month. A school term is approximately 4 months. This means that the school spends a total of US$1032 per term. The school has three academic terms, so the total amount of money spent on electricity in one academic year is approximately US$3096.
If these two expenditures are summed up (firewood plus electricity), the total expenditure in one academic year is approximately US$6096. The cost of installing a biogas plant at the school is approximately US$5277.57. This amount is less than the amount of money the school spends on firewood only in one academic year and it can be used to construct the biogas plant at the school. Therefore, the use of a biogas plant will not only curb deforestation in the district but also make great savings on the money the school is currently spending on firewood and electricity. This money can be used for other school requirements. Moreover, according to the Indian Agriculture Research Institute (ICAR), a single biogas plant with a capacity of 2.8 m3 can save a woodland area of 0.12 ha per year. Therefore, with this designed biogas plant whose capacity is 62 m3, it can save a forest area of 2.66 ha of woodland per year in the Phalombe district.
4. Conclusion
This research study has reviewed the common types of biogas plants that are used worldwide. There are several factors to be looked into when designing the type of biodigester to be used in a particular area. The choice of the right biodigester to be used in a particular area is of crucial importance when designing biogas plants. The design stage should take into consideration very important factors such as the type of substrate to be used, the continued availability of the substrate, availability of low-cost construction materials, the shape of the biodigester, weather conditions of the area where the biogas plant is going to be installed, the life span of the biogas plant which depends on the quality of the materials used in the construction and masonry skills. The results of this study have shown that human and canteen food wastes are good substrates to be co-digested in a biodigester to produce biogas which can be used for cooking and lighting hence the need to promote co-digestion biogas technology. In Malawi, there are no recycling technologies that can convert these wastes to something that does not pose health risks to humans once the wastes are disposed of. The use of clean technologies such as biogas for cooking and heating has been undermined by most developing countries. According to 2018 World Health Organization (WHO) report 3.8 million people, a year die prematurely from illness attributed to household air pollution which is caused by the inefficient use of solid fuels such as firewood crop wastes, charcoal, coal, and kerosene in open fires for cooking and heating. Therefore, this premature death could be avoided if the use of methane gas for cooking is encouraged and adapted by governments because it is a clean, cheap, and renewable source of energy.
Acknowledgements
The authors acknowledge the support from the African Centre of Excellence in Energy for Sustainable Development (ACE-ESD), University of Rwanda, College of Science and Technology (CST), Rwanda, and Malawi University of Science and Technology (MUST), Limbe, Malawi which made this research a success.
Funding
This research was financially supported by the World Bank and the Inter-University Council of East Africa (IUCEA) through the African Centre of Excellence in Energy for Sustainable Development (ACE-ESD) hosted at the University of Rwanda, College of Science and Technology (CST), Rwanda and Malawi University of Science and Technology (MUST), Limbe, Malawi. The support was awarded to NYIRENDA Austin Kawelamzenje. The funders, however, had no role in study design, data collection and analysis, preparation of the manuscript, and/or the decision to publish.
Competing Interests
Authors have declared that no competing interests exist.
References
- 1. Chagunda, M.M.G., Roberts, D.J., Chitawo, M.L. and Kasulo, V. (2009) Biogas Project in Malawi Leads to Other Benefits Bioenergy.
- 2. Malawi Country Report World Bank (2019) Country Environmental Analysis.
- 3. Adoniya Ben, S.K.J.G. and John, L.T. (2015) Energy Supply in Malawi-Options and Issues. Journal of Energy in Southern Africa, 26, 19-32. https://doi.org/10.17159/2413-3051/2015/v26i2a2192
- 4. Ramaraj, Y.U. (2016) Effect of Temperature on the Performance of Biogas Production from Duckweed. Chemistry Research Journal, 1, 58-66.
- 5. Awotiwon, M.O. (2007) Production of Biogas from Banana and Plant Peels. Advances in Environmental Biology, 1, 33-38.
- 6. Mamphweli, G.M.S. and Mukumba, P. (2016) Batch Anaerobic Co-Digestion of Cow Dung and Donkey Manure. South African Journal of Science, 112, 1-4.
- 7. Adhikari, R.S.S.K., Sims, R.E.H., Hasslet, S. and Murray, P. (2015) Improvement of Biogas Production Efficiency through Co-Digestion Cattle Dung with Crop Residues. Case Study: Nepal. Ninth International Conference on Sensing Technology, Auckland, 8-10 December 2015, 803-810. https://doi.org/10.1109/ICSensT.2015.7438507
- 8. Ngan, N.V.C., Chan, F.M.S.., Nam, T.S., Huynh, V.T., Maguyon-Detras, M.C., Hung, D.V., Cuong, D.M. and Hung, N.V. (2020) Anaerobic Digestion of Rice Straw for Biogas Production. Sustainable Rice Straw Management.
- 9. Twizerimana, M., Marimi, M., Bura, X. and Nganyi, E.O. (2020) Biogas Production from Co-Digestion of Cotton Yarn Waste and Human Urine. Journal of Energy Research and Reviews, 6, 20-29. https://doi.org/10.9734/jenrr/2020/v6i130158
- 10. Zhang, R. and Zhang, Z. (1999) Biogasification of Rice Straw with an Anaerobic-Phased Solids Digester System. Bioresource Technology, 68, 235-245. https://doi.org/10.1016/S0960-8524(98)00154-0
- 11. Gummert, M., Van Hung, N., Chivenge, P. and Douthwaite, B. (2020) Sustainable Rice Straw Management. Springer, Berlin. https://doi.org/10.1007/978-3-030-32373-8
- 12. Ramatsa, I.M., Akinlabi, E.T., Madyira, D.M. and Huberts, R. (2014) Design of the Bio-Digester for Biogas Production: A Review. Proceedings of the World Congress on Engineering and Computer Science, Vol. 2, San Francisco, 22-24 October 2014, 628-631.
- 13. Eckerwall, V., Larsson, M. and Jansson, C. (2015) Development and Testing of Biogas Technology in Malawi to Reduce Deforestation and Support Climate Change Mitigation and Adaptation.
- 14. Regattieri, A., Bortolini, M., Ferrari, E., Gamberi, M. and Piana, F. (2018) Biogas Micro-Production from Human Organic Waste—A Research Proposal. Sustainability, 10, 330. https://doi.org/10.3390/su10020330
- 15. Peter, M.K., Alfa, M.I., Datau, G., Aluwong, K.C. and Hadi, M.I. (2017) Design, Development and Performance Evaluation of an Anaerobic Plant. American Journal of Engineering Research, 6, 28-33.
- 16. Briefs, O.T. (2012) Design, Construction, and Maintenance of a Biogas Generator. 1-23.
- 17. Orgur, M.S. and Mbatia, E.O. (2013) Conversion of Kitchen Waste to Biogas. International Journal of Engineering Science, 2, 70-76.
- 18. Alfa, M.I., Wamyil, F.B., Daffi, R.E. and Igboro, S.B. (2017) Design, Development and Evaluation of Slaughterhouse Anaerobic Digestion Plant Model. American Journal of Engineering Research, 6, 70-74.
- 19. Ogur, E.O. and Irungu, P. (2013) Design of a Biogas Generator. International Journal of Engineering Research and Applications, 3, 630-635.
- 20. Dueñas-Berra, L.Y., Artiles-López, D.M., Hofbauer, A.M., Santiago-Azpiazu, G.C. and Morales-Hernández, J.L. (2015) Design Guide for Biodigester Treatment Plant in Cowshed Housing. ECORFAN.
- 21. Hoerz, T., Krämer, P., Klingler, B., Kellner, C., Wittur, T., Klopotek, F.V., Krieg, A. and Euler, H. (1998) Biogas Digest II.
- 22. Ali, M.F. and Islam, R. (2014) Designing Human and Kitchen Waste Based Biogas & Solar Plant for Pabna University of Science & Technology (PUST) Campus and Cost-Benefit Analysis after Renewable Energy Interconnection on PUST Campus’s Grid Network. 28-34.
- 23. Chen, X.G.A., Adl, M., Sheng, K.C. and Xia, Y.H. (2012) Examining a Hybrid Plug-Flow Pilot Reactor for Anaerobic Digestion of Farm-Based Biodegradable Solids. International Journal of Environment, 6, 335-344.
- 24. Kossmann, W. (1999) Biogas Digest: Biogas—Costs and Benefits and Biogas—Programme Implementation III.
- 25. Angelikadi, B.K. (2009) Serial CSTR Digester Configuration for Improving Biogas Production from Manure. Water Research, 43, 166-172. https://doi.org/10.1016/j.watres.2008.09.041
- 26. Omer, A.M. (2016) An Overview of Biomass and Biogas for Energy Generation: Recent Development and Perspectives. Advanced Materials: TechConnect Briefs, 2, 122-125. https://doi.org/10.31248/JBBD2016.010
- 27. Deng, L., Liu, Y., Wang, W., Deng, L., Liu, Y. and Wang, W. (2020) Biogas Plant. In: Deng, L.W., Liu, Y. and Wang, W.G., Eds., Biogas Technology, Springer, Berlin, 109-156. https://doi.org/10.1007/978-981-15-4940-3_4
- 28. Rwanda Standard Board (2016) Domestic Biogas Plant—Design, Construction and Operation Code of Practice (DRS 306:2016). Kigali.
- 29. Hafner, S.D., Koch, K., Carrere, H., Astals, S., Weinrich, S. and Rennuit, C. (2018) Software for Biogas Research: Tools for Measurement and Prediction of Methane Production. SoftwareX, 7, 205-210. https://doi.org/10.1016/j.softx.2018.06.005
- 30. Snakya, V. and Kalia, S.V. (2000) Anaerobic Digestion of Banana Stem Waste. Bioresource Technology, 73, 191-193. https://doi.org/10.1016/S0960-8524(99)00172-8
- 31. Edwin, M. and Joseph, S.S. (2015) Design Considerations of Anaerobic Digester for Producing Biogas Loaded with Cow Manure. International Journal of Applied Engineering Research, 10, 365-372.
- 32. Zheng, Y., Zhao, J., Xu, F. and Li, Y. (2014) Pretreatment of Lignocellulosic Biomass for Enhanced Biogas Production. Progress in Energy and Combustion Science, 42, 35-53. https://doi.org/10.1016/j.pecs.2014.01.001
- 33. Tumutegyereize, P., Ketlogetswe, C., Gandure, J. and Banadda, N. (2016) Effect of Variation in Co-Digestion Ratios of Matooke, Cassava, and Sweet Potato Peels on Hydraulic Retention Time, Methane Yield and Its Kinetics. Journal of Sustainable Bioenergy Systems, 6, 93-115. https://doi.org/10.4236/jsbs.2016.64009
- 34. Tran, K.C. (2017) Anaerobic Digestion of Microalgal Biomass: Effects of Solid Concentration and Pre-Treatment. Final Thesis, University of Southampton, Nusajaya.
- 35. Kheiredine, B., Derbal, K. and Bencheikh-Lehocine, M. (2014) Effect of Starting ph on the Produced Methane from Dairy Wastewater in Thermophilic Phase. Chemical Engineering Transactions, 38, 511-516.
- 36. Madyira, E.T.A.D.M., Huberts, R. and Ramatsa, I.M. (2014) Design of the Bio-Digester for Biogas Production: A Review. Proceedings of the World Congress on Engineering and Computer Science, San Francisco, 22-24 October 2014, 1-5.
- 37. Gashaw, A. (2014) Anaerobic Co-Digestion of Biodegradable Municipal Solid Waste with Human Excreta for Biogas Production: A Review. American Journal of Applied Chemistry, 2, 55-62. https://doi.org/10.11648/j.ajac.20140204.12
- 38. Guarino, G., Carotenuto, C., Di Cristofaro, F., Papa, S., Morrone, B. and Minale, M. (2016) Does the C/N Ratio Affect the Bio-Methane Yield? A Three Years Investigation of Buffalo Manure Digestion. Chemical Engineering Transactions, 49, 463-468.
- 39. Naik, L., Gebreegziabher, Z., Tumwesige, V., Balana, B., Mwirigi, J. and Austin, G. (2014) Factors Determining the Stability and Productivity of Small-Scale Anaerobic Digesters. Biomass and Bioenergy, 70, 51-57.
- 40. Oramusi, U.S. and Dahunsi, S.O. (2013) Co-Digestion of Food Waste and Human Excreta for Biogas Production. British Biotechnology, 3, 485-499. https://doi.org/10.9734/BBJ/2013/4476
- 41. Malikanthi, T.J.J., Ruchira, A. and Senayake, N.S. (2015) Anaerobic Digestion of Food and Market Waste; Waste Characterization and Biomethane Potential: A Case Study in Sri Lanka. SLEMA Journal, 18, 29-33. https://doi.org/10.4038/slemaj.v18i2.18
- 42. Sadjere, B.G.E., Ejiroghene, K.O. and Patrick, O.E. (2017) Effect of Organic Loading Rate (OLR) on Biogas Yield Using a Single and Three-Stages Continuous Anaerobic Digestion Reactors. International Journal of Engineering Research in Africa, 39, 147-155. https://doi.org/10.4028/https://www.scientific.net/JERA.39.147
- 43. IRENA (2016) Measuring Small-Scale Biogas Capacity and Production. International Renewable Energy Agency, 11-16.
- 44. National Domestic Biogas and Manure Programme (NDBMP) (2013) BIOGAS AUDIT: Summary of Findings and Recommendations. Dhaka, Bangladesh and Beijing, China.
- 45. Agus Haryanto, A., Triyono, S. and Nugroho, H.W. (2018) Effect of Hydraulic Retention Time on Biogas Production from Cow Dung in a Semi Continuous Anaerobic Digester. International Journal of Renewable Energy Development, 7, 93-100. https://doi.org/10.14710/ijred.7.2.93-100