[1]
|
SEBRAE (2010) Apenas 13% das Empresas Tem Gestao de Risco Eficaz. Auditoria Interna do Sistema SEBRAE.
|
[2]
|
Buzzi, D.C. (2010) Diretrizes para o Gerenciamento de Risco em Incorporadoras da Construcao Civil: Uma Abordagem Utilizando Logica Difusa, in Programa de Pos Graduacao em Engenharia Civil. UFSC, Florianopolis.
|
[3]
|
Wang, J. and Yuan, H. (2010) Factors Affecting Contractors’ Risk Attitudes in Construction Projects: Case Study from China. International Journal of Project Management, 29, 209-219. http://dx.doi.org/10.1016/j.ijproman.2010.02.006
|
[4]
|
Correa, P.S. (2010) O Papel das Incorporadoras e das Construtoras na Construcao Civil Brasileira. Palestra-FGV UNICOC-Fundacao Getúlio Vargas, Ribeirao Preto.
|
[5]
|
Hsueh, S.L., et al. (2007) On-Line Multi-Criterion Risk Assessment Model for Construction Joint Ventures in China. Automation in Construction, 16, 607-619. http://dx.doi.org/10.1016/j.autcon.2007.01.001
|
[6]
|
Lam, K., et al. (2007) Modelling Risk Allocation Decision in Construction Contracts. International Journal of Project Management, 25, 485-493. http://dx.doi.org/10.1016/j.ijproman.2006.11.005
|
[7]
|
Kern, A.P. and Formoso, C.T. (2006) A Model for Integrating Cost Management and Production Planning and Control in Construction. Journal of Financial Management of Property and Construction, 11, 75-90. http://dx.doi.org/10.1108/13664380680001081
|
[8]
|
Liu, L. and Zhu, K. (2007) Improving Cost Estimates of Construction Projects Using Phased Cost Factors. Journal of Construction Engineering and Management, 133, 91-95. http://dx.doi.org/10.1061/(ASCE)0733-9364(2007)133:1(91)
|
[9]
|
Hoffmann, V.E., Procopiak, J.A. and Rossetto, C.R. (2008) As estrategias de influencia dos stakeholders nas organizacoes da indústria da construcao civil: setor de edificacoes em Balneario Camboriú—SC. Revista Ambiente Construído, Porto Alegre, 8, 21-35.
|
[10]
|
Yang, J.-B. and Peng, S.-C. (2008) Development of a Customer Satisfaction Evaluation Model for Construction Project Management. Building and Environment, 43, 458-468. http://dx.doi.org/10.1016/j.buildenv.2006.07.044
|
[11]
|
CMMI, P.T. (2006) CMMI® for Development, Version 1.2—Improving Processes for Better Products. S.E. Institute, Editor, Carnegie Mellon University, Pittsburgh.
|
[12]
|
FERMA (2003) Norma de Gestao de Riscos. Federation of European Risk Management Associations, Brussels.
|
[13]
|
PMBOK (2008) Um guia do conjunto de conhecimentos em gerenciamento de projetos. 4a Edicao Edition, PMI— Project Management Institute, Inc.
|
[14]
|
RAMP (2004) Risk Analysis and Management for Projects. ICE—Institution of Civil Engineers, Faculty of Actuaries, and Institute of Actuaries, London.
|
[15]
|
AS/NZS:4360 (2004) The Australian and New Zealand Standard on Risk Management, AS/NZS 4360: 2004, in Risk Management. Sidney.
|
[16]
|
Han, S.H., et al. (2008) A Web-Based Integrated System for International Project Risk Management. Automation in Construction, 17, 342-356. http://dx.doi.org/10.1016/j.autcon.2007.05.012
|
[17]
|
Keeney, R.L. (1996) Value-Focused Thinking: A Path to Creative Decisionmaking. Harvard University Press, Harvard.
|
[18]
|
Lacerda, R.T.O., Ensslin, L. and Ensslin, S.R. (2012) Uma Analise Bibliometrica da Literatura Sobre Estrategia e Avaliacao De Desempenho. Gestao & Producao, 1, 59-78.
|
[19]
|
Karlsson, C. (2008) Researching Operations Management. Taylor & Francis, New York.
|
[20]
|
Ensslin, L., et al. (2010) ProKnow-C, Knowledge Development Process—Construtivist. Processo tecnico com patente de registro pendente junto ao INPI. Brazil.
|
[21]
|
Codinhoto, R., et al. (2008) The Effects of the Built Environment on Health Outcomes. The Health and Care Infrastructure Research and Innovation Centre.
|
[22]
|
Azevedo, R.C., et al. (2011) Avaliacao de desempenho do processo de orcamento: estudo de caso em uma obra de construcao civil. Revista Ambiente Construído, Porto Alegre, 11, 85-104. http://dx.doi.org/10.1590/S1678-86212011000100007
|
[23]
|
Lacerda, R.T.O., Ensslin, L. and Ensslin, S.R. (2014) Research Opportunities in Strategic Management Field: A Performance Measurement Approach. Int. Journal Business Performance Management, 15, 158-174.
|
[24]
|
Ensslin, S.R., et al. (2014) Evidenciacao do estado da arte da avaliacao da seguranca do trabalho em empreendimentos da construcao civil. Interciencia, 39, 16-23.
|
[25]
|
Azevedo, R.C. ( 2013) A Model for Risk Management in Property Development Using Multicriteria Desion Aid— Constructivist Methodology (MCDA-C). PPGEC, UFSC, Florianopolis.
|
[26]
|
Azevedo, R.C., et al. (2013) Performance Measurement to Aid Decision Making in the Budgeting Process for Apartment Building Construction: A Case Study Using MCDA-C. Journal of Construction Engineering and Management, 139, 225-235.
|
[27]
|
Ensslin, L., Ensslin, S.R. and Pacheco, G.C. (2012) Um estudo sobre seguranca em estadios de futebol baseado na analise bibliometrica da literatura internacional. Perspectivas em Ciencia da Informacao, 17, 71-91.http://dx.doi.org/10.1590/S1413-99362012000200006
|
[28]
|
Afonso, M.H.F., et al. (2012) Como construir conhecimento sobre o tema de pesquisa? Aplicacao do processo PROKNOW-C na busca de literatura sobre avaliacao do desenvolvimento sustentavel. Revista de Gestao Social e Ambiental, 5, 47-62.
|
[29]
|
Da Rosa, F.S., et al. (2012) Envirnonmental Disclosure Management: A Construtivist Case. Management Decision, 50, 1117-1136. http://dx.doi.org/10.1108/00251741211238364
|
[30]
|
Vilela, L.O. (2012) Aplicacao do PROKNOW-C para selecao de um portifolio bibliografico e analise bibliometrica sobre avaliacao de desempenho da gestao do conhecimento. Revista Gestao Industrial, 8, 76-92.
|
[31]
|
Bortoluzzi, S.C., Ensslin, S.R. and Ensslin, L. (2011) Avaliacao de desempenho multicriterio como apoio à gestao de empresas: Aplicacao em uma empresa de servicos. Gestao & Producao, 18, 633-650.http://dx.doi.org/10.1590/S0104-530X2011000300014
|
[32]
|
Tasca, J.E., et al. (2010) An Approach for Selecting a Theoretical Framework for the Evaluation of Training Programs. Journal of European Industrial Training, 34, 631-655. http://dx.doi.org/10.1108/03090591011070761
|
[33]
|
PETRI, S.M. (2005) Modelo para apoiar a avaliacao das abordagens de gestao de desempenho e sugerir aperfeicoamentos: Sob a otica construtivista. Universidade Federal de Santa Catarina, Florianopolis.
|
[34]
|
Ensslin, L. and Ensslin, S.R. (2008) Notas de aula. Disciplina de Avaliacao de Desempenho do Programa de Pos Graduacao em Engenharia da Producao. UFSC.
|
[35]
|
JCR. Journal Citation Reports—JCR Science Edition. Subject Categories CONSTRUCTION & BUILDING TECHNOLOGY; ENGINEERING, CIVIL 2011. http://admin-apps.webofknowledge.com/JCR/JCR?RQ=RECORD&journal=CIVIL+ENG&rank=24#cited_hlife.
|
[36]
|
CAPES (2012) Portal de Periodicos CAPES. http://www.periodicos.capes.gov.br/option =com_phome&Itemid=68&
|
[37]
|
Reuters, T. (2009) EndNote X3. The Thomson Corporation.
|
[38]
|
Google (2011) Google Academico. http://scholar.google.com.br/
|
[39]
|
Carr, V. and Tah, J.H.M. (2001) A Fuzzy Approach to Construction Project Risk Assessment and Analysis: Construction Project Risk Management System. Advances in Engineering Software (Compendex), 32, 847-857.
|
[40]
|
Chapman, R.J. (2001) The Controlling Influences on Effective Risk Identification and Assessment for Construction Design Management. International Journal of Project Management, 19, 147-160. http://dx.doi.org/10.1016/S0263-7863(99)00070-8
|
[41]
|
Dey, P.K. (2001) Decision Support System for Risk Management: A Case Study. Management Decision, 39, 634-649. http://dx.doi.org/10.1108/00251740110399558
|
[42]
|
CAPES (2012) WebQualis-Classificacao de Periodicos por Estrato. http://qualis.capes.gov.br/webqualis/principal.seam
|
[43]
|
Ensslin, L., Giffhorn, E., Ensslin, S.R. Petri, S.M. and Vianna, W.B. (2010) Avaliacao do desempenho de empresas terceirizadas com o uso da metodologia multicriterio de apoio à decisao-construtivista. Pesquisa Operacional, 30, 125-152. http://dx.doi.org/10.1590/S0101-74382010000100007
|
[44]
|
Dikmen, I. and Birgonul, M.T. (2006) An Analytic Hierarchy Process Based Model for Risk and Opportunity Assessment of International Construction Projects. Canadian Journal of Civil Engineering, 33, 58-68.http://dx.doi.org/10.1139/l05-087
|
[45]
|
Dikmen, I., Birgonul, M.T. and Gur, A.K. (2007) A Case-Based Decision Support Tool for Bid Mark-Up Estimation of International Construction Projects. Automation in Construction, 17, 30-44. http://dx.doi.org/10.1016/j.autcon.2007.02.009
|
[46]
|
Roy, B. (1994) On Operational Research and Decision Aid. European Journal of Operational Research, 73, 23-26.http://dx.doi.org/10.1016/0377-2217(94)90136-8
|
[47]
|
Zeng, J., An, M. and Smith, N.J. (2007) Application of a Fuzzy Based Decision Making Methodology to Construction Project Risk Assessment. International Journal of Project Management, 25, 589-600. http://dx.doi.org/10.1016/j.ijproman.2007.02.006
|
[48]
|
Kartam, N.A. and Kartam, S.A. (2001) Risk and Its Management in the Kuwaiti Construction Industry: A Contractors’ Perspective. International Journal of Project Management (Compendex), 19, 325-335.
|
[49]
|
Zayed, T.M. and Chang, L.M. (2002) Prototype Model for Build-Operate-Transfer Risk Assessment. Journal of Management in Engineering, 18, 7-16. http://dx.doi.org/10.1061/(ASCE)0742-597X(2002)18:1(7)
|
[50]
|
Zayed, T., Amer, M. and Pan, J. (2008) Assessing Risk and Uncertainty Inherent in Chinese Highway Projects Using AHP. International Journal of Project Management (Compendex), 26, 408-419.
|
[51]
|
Thomas, A.V., Kalidindi, S.N. and Ganesh, L.S. (2006) Modelling and Assessment of Critical Risks in BOT Road Projects. Construction Management and Economics (Compendex), 24, 407-424.
|
[52]
|
Zhang, G.M. and Zou, P.X.W. (2007) Fuzzy Analytical Hierarchy Process Risk Assessment Approach for Joint Venture Construction Projects in China. Journal of Construction Engineering and Management-Asce, 133, 771-779. http://dx.doi.org/10.1061/(ASCE)0733-9364(2007)133:10(771)
|
[53]
|
Shang, H., et al. (2005) An Intelligent Risk Assessment System for Distributed Construction Teams. Engineering, Construction and Architectural Management (Compendex), 12, 391-409.
|
[54]
|
Bu-Qammaz, A.S., Dikmen, I. and Birgonul, M.T. (2009) Risk Assessment of International Construction Projects Using the Analytic Network Process. Canadian Journal of Civil Engineering, 36, 1170-1181.http://dx.doi.org/10.1139/L09-061
|
[55]
|
Xu, Y., et al. (2010) Developing a Risk Assessment Model for PPP Projects in China—A Fuzzy Synthetic Evaluation Approach. Automation in Construction, 19, 929-943. http://dx.doi.org/10.1016/j.autcon.2010.06.006
|
[56]
|
Dey, P.K. (2010) Managing Project Risk Using Combined Analytic Hierarchy Process and Risk Map. Applied Soft Computing Journal (Compendex), 10, 990-1000.
|
[57]
|
Xiang, Y., Liu, C., Zhang, K. and Wu, Q.Q. (2010) Risk Analysis and Management of Submerged Floating Tunnel and Its Application. Procedia Engineering, 4, 107-116. http://dx.doi.org/10.1016/j.proeng.2010.08.013
|
[58]
|
Tang, L.C.M., Leung, A.Y.T. and Wong, C.W.Y. (2010) Entropic Risk Analysis by a High Level Decision Support System for Construction SMEs. Journal of Computing in Civil Engineering (Compendex), 24, 81-94.
|
[59]
|
Tah, J.H.M. and Carr, V. (2001) Towards a Framework for Project Risk Knowledge Management in the Construction Supply Chain. Advances in Engineering Software (Compendex), 32, 835-846.
|
[60]
|
Choi, H.H. and Mahadevan, S. (2008) Construction Project Risk Assessment Using Existing Database and Project-Specific Information. Journal of Construction Engineering and Management (Compendex), 134, 894-903.
|
[61]
|
Dikmen, I., Birgonul, M.T. and Han, S. (2007) Using Fuzzy Risk Assessment to Rate Cost Overrun Risk in International construction projects. International Journal of Project Management (Compendex), 25, 494-505.
|
[62]
|
Abdelgawad, M. and Fayek, A.R. (2011) Fuzzy reliability analyzer: Quantitative assessment of risk events in the construction Industry Using Fuzzy Fault-Tree Analysis. Journal of Construction Engineering and Management (Compendex), 137, 294-302.
|
[63]
|
Correa, L. (2008) Gestao de Projetos aplicados à construcao civil. Revista IETEC-Instituto de Educacao Tecnologica, Belo Horizonte, Brasil.
|
[64]
|
Fan, M., Lin, N.P. and Sheu, C. (2008) Choosing a Project Risk-Handling Strategy: An Analytical Model. International Journal of Production Economics, 112, 700-713. http://dx.doi.org/10.1016/j.ijpe.2007.06.006
|
[65]
|
Barzilai, J. (2001) On the Foundations of Measurement. Proceedings of the 2001 IEEE International Conference on Systems, Man and Cybernetics, Tucson, 7-10 October, 2001, 401-406.
|
[66]
|
Lacerda, R.T.O., Ensslin, L. and Ensslin, S.R. (2011) A Performance Measurement View of IT Project Management. International Journal of Productivity and Performance Management, 60, 132-151. http://dx.doi.org/10.1108/17410401111101476
|
[67]
|
Ensslin, L., et al. (2012) Software Process Assessment and Improvement Using Multicriteria Decision Aiding-Constructivist. Journal of Information Systems and Technology Management, 9, 473-496.
|