[1]
|
Segerstedt, A. (2002) Master Production Scheduling and a Comparison of Material Requirements Planning and Cover-Time Planning. Industrial Logistics, 12.
|
[2]
|
Goldratt, M. (1992) The Goal. North River Press, New Haven, 139-159.
|
[3]
|
Planert, G. (1999) Focusing Material Requirement Planning (MRP) towards Performance. European Journal of Operational Research, 119, 91-99. http://dx.doi.org/10.1016/S0377-2217(98)00339-7
|
[4]
|
Conner, G. (2001) Lead Time and Activity, Lean Manufacturing for the Small Shop. Society of Manufacturing Engineers, Dearborn, 56.
|
[5]
|
Vandaele, N. and De Boeck, L. (2003) Advanced Resource Planning. Robotics and Computer Integrated Manufacturing, 19, 211-218. http://dx.doi.org/10.1016/S0736-5845(02)00081-9
|
[6]
|
Planert, G. (1999) Focusing Material Requirement Planning (MRP) towards Performance. European Journal of Operational Research, 119, 91-99. http://dx.doi.org/10.1016/S0377-2217(98)00339-7
|
[7]
|
Schuster, E.W., Allen, J. and D’ltri, P. (1998) Capacitated Material Requirements Planning and Its Application. Process Industries, 8.
|