Schedule Control of Coal Mine Construction Projects Based on Factor Analysis

Abstract

Schedule management is the crucial capability for large-scale coal mining investors to successful finish the construction project, which could get by the accumulation of the long-time institutional executive force and ability training. By using factor analysis and validation analysis, extracted control factors of schedule management from data have been made in large coal mine construction companies. Some control factors have a greater influence on the schedule management which are the system factor, measures factor, economic controlling factor, behavioral factor, process factor, organization factor, thus the enterprise schedule management system should include the terms of the above factors.

Share and Cite:

L. Fan, H. Zhang and X. Li, "Schedule Control of Coal Mine Construction Projects Based on Factor Analysis," Geomaterials, Vol. 3 No. 3, 2013, pp. 67-70. doi: 10.4236/gm.2013.33009.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] Z. D. Liu, “Application of Factor Analysis to Evaluation of Business Technology Innovation Ability,” Journal of Chongqing Normal University (Natural Science Edition), Vol. 23, No. 2, 2006, pp. 75-79.
[2] L. J. Liu and L. J. Wu, “Demonstrative Analysis on the Economic Development Condition of 12 Western Cities in China Based on Factor Analysis,” Journal of Chong-qing University of Technology (Natural Science), Vol. 24, No. 11, 2010, pp. 118-122.
[3] J. R. Zhang, Z. W. Jia and Y. M. Sun, “Factorial Analysis on a Listed Company’s Profitability,” Modern Economic Science, Vol. 26, No. 6, 2004, pp. 53-59.
[4] W. D. Li, “Applied Multivariate Statistical Analysis,” Peking University Press, Beijing, 2008.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.