Optimal Sizing of Capacitor Bank for Increasing Substation Capacity of Mamou

Abstract

In order to increase the available power of the electrical energy distribution station and improve the voltage profile of the distribution lines, the use of shunt capacitor banks is indicated. The main results obtained during this study are: a reduction in subscribed power from 14913.978 kVA to 14010.100 kVA, a reduction in the transformer load rate from 99.4% to 93.4%, a reduction in reactive power called from 5481.729 kVAr to 481.729 kVAr, an increase in the active power transported by the substation from 8505.062 kW to 8962.323 kW, a reduction in the voltage drop from 4.8% to 3.9%, an increase in the power available at the secondary of the transformer station at full load from 13950 kW to 14700 kW and an annual electrical energy saving of 339943.48 kWh of electrical energy, therefore fuel savings and a reduction in CO2 and SO2 emissions due to this energy saving will be achieved. The installation of capacitor banks for optimization of reactive energy allowed a reduction in the current called therefore a reduction in the absorbed power: 14153.061 kVA, i.e. a reduction of 903.876 kVA. It is therefore essential that energy players are convinced of the need to install capacitors to reduce or even eliminate their reactive energy bill. This is necessarily accompanied by an investment by Electricité De Guinée by setting up active and reactive energy meters but also by implementing pricing in line with the reduction in the transfer of reactive energy in the network.

Share and Cite:

Toupouvogui, J. , Camara, M. , Sakouvogui, A. and Keita, M. (2023) Optimal Sizing of Capacitor Bank for Increasing Substation Capacity of Mamou. World Journal of Engineering and Technology, 11, 217-233. doi: 10.4236/wjet.2023.112015.

1. Introduction

Any electrical system using alternating current involves two forms of energy: active energy and reactive energy. In processes using electrical energy, only the active energy is transformed within the production tool into mechanical, thermal, light, etc. energy. The other, reactive energy, is used in particular to supply the magnetic circuits of electrical machines (motors, autotransformers, etc.). In addition, certain components of electrical transmission and distribution networks (transformers, lines, etc.) also consume reactive energy in certain cases of operation.

The circulation of active and reactive power causes power losses in the distribution networks (approximately 13% of the total energy produced) [1] and voltage drops in the conductors [2] [3] . Active losses reduce the overall efficiency of networks and voltage drops are detrimental to the maintenance of good voltage that the distributor owes to its customers. Thus, it is therefore technically preferable to produce them as close as possible to the places of consumption.

For active power, it is shown that it is more economical to produce it centrally and then distribute it to customers. The cost of transport is much lower than the additional cost of production carried out locally. On the other hand, for reactive power, it is economically more interesting to produce it, in whole or in part, locally by autonomous reactive energy generators.

Electrical distribution networks ensure the transfer of electrical energy to end users (industrial, residential and commercial). For a given line configuration and given that the active power demand is incompressible, the reduction of voltage drops and that of power losses can therefore only be achieved by reducing the transit of the strong reactive components of the line current. For this purpose, among strategies such as phase balancing, use of distributed generators, grid reconfiguration, and location of energy storage systems [4] , reactive energy compensation is the most economical [5] [6] [7] [8] . However, it is not enough to place capacitor banks to say that the problem posed (circulation of strong reactive currents) is solved. By optimizing reactive energy compensation, we must understand the choice of the power of the compensation device, its location and even the time during which it will remain online if it is an adaptive compensation [2] [7] [9] .

In recent decades, contemporary lifestyle, as well as economic and technological development, has increased household electricity consumption. Excessive electricity use has a negative impact on the environment, increasing the carbon footprint and contributing to climate change.

In recent years, the municipalities supplied by the Mamou substation have experienced an increase in their energy consumption due to the increase in their populations [10] and in the standard of living through the purchase of electronic devices, thus provoking an exorbitant call current in the network. This inrush current pushes the operators of this substation to perform manual voltage adjustment maneuvers using the adjustment taps provided for this purpose on the primary windings of the substation transformer.

The purpose of this study is to determine the optimum power of the capacitor bank for reactive energy compensation in order to increase the supply capacity and improve the voltage profile of the Mamou substation.

2. Material and Methods

2.1. Materials

2.1.1. Presentation of the Study Area

The prefecture of Mamou, capital of the administrative region of Mamou is between 9˚54' and 11˚10' North latitude and 11˚25' and 12˚26' West longitude with an average altitude of 700 m. It covers an area of 8000 km2 with a population of 318981 inhabitants, an average density of 30 inhabitants per km2. Its climate is of the Foutanian type, characterized by the alternation of two (2) seasons (dry and rainy) of equal duration. The Urban Commune of Mamou is located 270 km from the capital, Conakry, it has 28 districts. The highest temperatures are observed in March-April (37˚C and 38˚C), while the lowest are noted in December (11˚C) [10] (Figure 1).

2.1.2. Presentation of the Mamou Substation

The Mamou substation (110/30KV) is located 6 km from the city center in the Séré district on the Mamou-Dabola national road with an area of 100 m2. It is a distribution station which is supplied by the Linsan-Maou line of the Garafiri system over a 43 km route on 110 pylons. This substation with an installed capacity of 15 MVA supplies the town of Mamou via the “Petel” and “Centre-ville” feeders and the towns of Dalaba, Pita and Labé via the “Fouta djallon” feeder. The substation transformer is a three-phase step-down transformer (11.25/15MVA, 110/30KV), ONAN/ONAF type, equipped with a 12-position UZERN 380/150 CAT type on-load tap changer which serves as a means of regulation manual secondary voltage. The transformer parameters are: HT: Nominal rated voltage 110000Y/63510 ± 15% volts; HT Shock withstand, line: 550 KV; neutral 325 KV; LV Shock withstand, line: 170 KV, neutral 170 KV; Apparent power S = 15 MVA; Current I = 274.9 A. The Mamou substation supplies three departures: the Fouta Djallon departure; the city center departure and the Petel departure. The Single-line diagram of the Mamou substation is shown in Figure 2.

Figure 1. Map of the commune of Mamou.

Figure 2. Single-line diagram of the Mamou substation.

Photo of the electrical substation

Legend: 1-Insulators, 2-Oil conservator cylinder, 3-Nameplate, 4-Radiator, 5-Pressure gauges, 6-Siligazel, 7-Tap changer, 8-Lightning arresters, 9-Voltage transformer.

2.1.3. Materials Used

As part of this work we used the MATLAB environment, the Microsoft Excel software, the extract of the annual statistics of the peaks of load of the arteries of the Electricity of Guinea.

2.2. Method

The method used consists in finding or choosing a mathematical model linking the main electrical quantities to the power factor. Thus, we have chosen a model that takes into account the increase in the supply capacity of the substation (increase in the active power available at the secondaries of the substation transformer) [11] . For data collection, we extracted peak load statistics from the artery of the Mamou substation through the annual statistics of the EDG for the years 2018, 2019, 2020 and 2021 [12] . Then we determined the total consumption of the different departures from the Mamou substation. The analytical method was used for the optimization [13] [14] . The analytical method combined with the numerical method allowed us to do the simulation using MATLAB software.

The reactive energy compensation bank sizing optimization equation is given by Equation (1) [11] .

Δ K V A S = S [ 1 ( Q C 2 p f 2 / S 2 ) + ( Q C sin φ / S ) 1 ] (1)

where: S: Apparent power of the transformer; pf: Desired power factor; sinφ: Sinus of the uncorrected power factor angle, Qc: reactive power of capacitors bank.

The equations used to determine the substation parameters before and after compensation optimization are as follows [14] [15] [16] :

The available power of the transformer is determined by Equation (2).

P d i s f = S T cos φ (2)

The demand or subscribed power is determined by Equation (3).

S = P P cos φ (3)

The charging rate at the transformer is determined by Equation (4).

T X C = S S T n (4)

The current in the installation downstream of the circuit breaker is determined by Equation (5).

I = P P / ( 3 U n cos φ ) (5)

The amount of annual electrical energy saved is determined by Equation (6).

E a = [ R Q C ( 2 S sin φ Q C ) 8760 ] / ( 1000 U 2 ) (6).

The capacitance of capacitors is determined by Equation (7).

C = Q C / ( 3 U 2 ω ) (7).

The resonant frequency in capacitor banks is determined by Equation (8).

f R = f ( S C C / Q C ) (8)

The short-circuit power of the transformer is determined by Equation (9).

S C C = ( S / U C C ) 10 (9)

The amplification of harmonics is determined by Equation (10).

F a = Q C S C C / P (10)

The increase in voltage is determined by Equation (11).

U = ( Q C / S T ) X T (11)

The subscribed apparent power gain is determined by Equation (12).

G S = S S (12)

The annual gain on the fixed premium is determined by Equation (13).

G A = G p P u / kVA (13)

The reactive power gain is determined by Equation (14).

G Q = Q Q (14)

The cost of installing and purchasing the compensation system is determined by Equation (15).

C T = P u / kvar G Q (15)

The payback time of the amount invested for the installation is determined by Equation (16).

T = C T / G A (16)

where: S: Apparent power of the transformer; pf: Desired power factor; sinφ: Sinus of the uncorrected power factor angle; R: Electrical resistance in ohms; U: phase-to-phase voltage (voltage between phase); Nh = 8760: Number of hours per year.

3. Results and Discussions

3.1. Evolution of Consumption of Departures from the Mamou Substation

This Figure 3 shows that in recent years, the urban municipalities supplied by the Mamou substation have experienced an increase in their energy consumption due to the increase in their populations and in the standard of living through the purchase of electronic devices, household appliances thus causing an exorbitant inrush of current in the network.

3.2. Electro-Energy Balance of the Various Departures from the Mamou Substation

The results of the electro-energy balance (active power, reactive power, apparent power, current and power factor) of the various departures from the Mamou substation for the year 2021 show that: A load peak around 7p.m.-8p.m. due to the massive use of electrical energy in households supplied by the various outgoing stations (Figure 4).

It appears from these graphs that the Fouta Djalon departure is the busiest, i.e. 58% of the Mamou substation load as shown in the diagram below (Figure 5).

A large variation in the reactive energy demand of the various substation feeders. This leads us to propose a dynamic compensation (Figure 6).

We note a bad power factor of the various departures during the night hours, this is due to the use for lighting of fluorescent lamps which have a bad power factor (0.48), Uncompensated discharge lamps (0.4 to 0.6); the use of induction furnaces with integrated compensation (0.85), resistance welding machines (0.3 to 0.8), static single-phase arc welding stations (0.5) (Figure 7).

The “Fouta Djalon” feeder represents the largest load of the Mamou substation with a current at peak times of 100 A, i.e. 57% of the substation outgoing current, 36.37% of the substation’s nominal current (274.9 A). But this percentage does not give rise to a sectoral compensation (Compensation by sector) (Figures 8-10).

Figure 3. Evolution of consumption of departures from the Mamou substation [12] .

Figure 4. Active powers of the different departures from Mamou Post.

Figure 5. Reactive powers of the different feeders from the Mamou substation.

Figure 6. Variation in the power factor of the various substation feeders.

Figure 7. Currents from the different departures from Mamou substation.

Figure 8. Active powers transmitted by the substation transformer.

Figure 9. Substation primary electrical parameters.

Figure 10. Electrical parameters at substation secondary.

3.3. Simulation of the Objective Function

The results of this simulation show us that with compensation, the apparent power available at the secondary of the transformers increases up to a certain value and then decreases to zero. For the case of the Mamou substation, we find that this transformer substation supply capacity reaches its maximum value (optimal value) for a reactive power Qc = 5178.4 KVAr, therefore to optimize the reactive energy compensation at Mamou substation, a bank of capacitors with a power equal to 5000 KVAr must be installed. Thus, the supply capacity of the transformer station, i.e. the power available at the secondary of the transformer station, reaches an optimal (maximum) value, i.e. an increase of: ∆S = 961.049 KVA. Beyond this value we note a reduction, even a cancellation of this increase at approximately 9800 KVAr (Figure 11).

In electrical energy distribution networks, a certain reactive power is imposed according to the active power. This constraint is imposed by the tgφ function, that is to say Q/P, if the Q/P ratio is greater than the value of tgφ imposed, the substation requires a power capacitor bank Qc, which will retreat to Q. This will decrease tgφ and approach the value imposed to satisfy the constraints of the production of electrical energy. However, when the reactive energy Qc supplied by the capacitor bank becomes greater than that required by the installation, an overcompensation of the reactive power is obtained, i.e. the installation becomes a producer of reactive power on the network. This results in the fact that the overall installation will have its current ahead of its voltage. It will therefore have a “front” and not “rear” phase shift, and the installation will be likened to a capacitive receiver, and not an inductive one (Figure 12).

Determining the power of the capacitor bank allows us to choose the type of battery (fixed or automatic battery). So the Qc/Sn ratio gives us: 15000/5000 = 0.3 or 30%. This allows us to choose an automatic compensation. As the demand for electrical energy from the various outlets of the substation is variable, we offer dynamic compensation which is gradually adjusted as needed (response time of less than a minute).

3.4. Power Absorbed by the Various Substation Feeders

Before the installation of the capacitor banks (without compensation), a large reactive current was drawn on the network by the feeders, i.e. a power of 14913.978 KVA. The installation of capacitor banks for optimization of reactive energy allowed a reduction in the current called therefore a reduction in the absorbed power: 14153.061 KVA, i.e. a reduction of 903.876 KVA (Figure 13, Figure 14).

The active power available at the secondary of a transformer is all the greater as the power factor of the installation is high. The efficiency of a transformer depends on its load and the power factor of the loads it supplies. The installation of a compensation device (capacitor battery) of 5000 KVAr at the secondary of the transformer will make it possible to transport an active power of 8962.323 KW. This power is greater than that transported by the transformer station, before the reactive energy compensation (8505.062 KW).

3.5. Effects of Reactive Energy Compensation [15]

Improving the power factor by installing a compensation device affects:

Figure 11. Evolution curve of Mamou substation supply capacity.

Figure 12. Evolution of feeding capacity for overcompensation.

Figure 13. Power absorbed by feeders before and after compensation.

Figure 14. Active power transmitted before and after compensation.

➢ The available power of the transformer

With an improved power factor of 0.98, the power available at the Mamou substation (15000 KVA) would be:

P d i s = S T cos φ = 15000 × 0.98

P d i s = 14700 kW

➢ The power demand

With a load of 13.87 MW in March 2020 and a power factor of 0.98, the subscribed power would be:

S = P P cos φ = 13870 0.98 = 14153 KVA

➢ The load rate at the Post level

For a subscription of 14153 kVA and a nominal power of 15000 kVA:

T X C = S S T n 100 = 14153 15000 100 = 94.35 %

➢ The current carried in the installation downstream of the circuit breaker

For an active power peak of 13870 kW, Un2 = 30000 V and a cosφ = 0.98, the current passed through the installation downstream of the main circuit breaker would be:

I = P P 3 U n cos φ = 13870 3 30000 0.98 = 272.37 A

➢ Reduced voltage drop

The relative voltage drops in the Mamou substation transformer under a load of 13870 KW and 5481.729 KVAr, before and after compensation are given in Table 1 below. The compensation decreases the reactive power Q and therefore the voltage drop.

The installation of capacitor banks downstream of the transformers will reduce the voltage drop from 4.8% to 3.9%.

Table 1. Impact of reactive power compensation.

At the terminals of the transformer station, reactive energy compensation allows an increase in voltage [17] [18] .

% U = Q C S T X T

Thus the installation of capacitor banks will give a voltage increase of 1.69% which is far from an overvoltage which could be harmful for the receivers.

With the reduction of losses due to the installation of capacitor banks, we obtain an annual saving of 339943.48 KWh of electrical energy. Therefore, fuel savings and a reduction in CO2 and SO2 emissions due to this energy saving will be obtained.

3.6. Synthesis after Power Factor Improvement

Before compensation, the installation consumed a reactive power of 5481.729 KVAr. After raising the power factor, the installation would consume a reactive power of 481.729 KVAr. The compensation device must provide a power of 5000 KVAr. Graphically, for an installed power of 13870 kW, the composition of the powers before and after power factor improvement gives:

S 1 = 14913.978 KVA ; Q 1 = 5481.729 KVAr ; S 2 = 14153.061 KVA ; Q 2 = 481.729 KVAr ; φ 1 = 29.54 ; φ 2 = 18.19.

After compensation of the reactive energy by placement of the compensation device, the reactive power taken from the network is lower. Part of the reactive power shuttles between the compensation device and the load and therefore no longer constitutes a load for the network. The transformer, the cables are partly relieved.

We are therefore thinking of installing an automatic compensation system with a Qc/Sn ratio = 30% > 15% (percentage authorized) (Figure 15).

Figure 15. Composition of powers before and after compensation.

where:

S1: Subscribed apparent power before reactive energy compensation;

S2: Subscribed apparent power after reactive energy compensation;

Q1: Reactive energy absorbed before reactive energy compensation;

Q2: Reactive energy absorbed before reactive energy compensation;

P: Active power of the installation;

j1: Angle of phase shift before reactive energy compensation;

j2: Phase angle after reactive energy compensation.

3.7. Economic Parameters of the Compensation Scheme

The economic interest of raising the power factor is measured by composing the cost of installing capacitor banks with the savings they provide:

➢ Gain in subscribed apparent power

The difference between the apparent power subscription before and after power factor improvement is:

G S = S 1 S 2 = 14913.978 14010.100 = 903.878 kVA

➢ Annual gain on the fixed premium

For an amount of $39.2/kVA, including VAT, the annual gain on the fixed premium would be:

G A = G p P u / kVA

G A = 903.878 × 39.2

G A = $ 35432.0176

➢ Gain in reactive power and total cost

The difference in the reactive powers consumed before and after raising the power factor is:

G Q = Q Q = 5481.729 481.729

G Q = 5000 kVAr

For a reactive power to be compensated of 5000 kVAr and a unit price/kVar to be installed of $28, the cost of installing and purchasing the compensation system would be:

C T = P u / k v a r G Q

C T = 28 × 5000 = $ 140000

➢ Investment payback time

The return time of the amount invested for the installation of the compensation system would be:

T = C T G A = 140000 35432.0176 = 3.95 ans

This gives four (4) years for the return on investment.

3.8. Observations after Compensation

By increasing the power factor from 0.93 to 0.98, the load on the secondary level of the supply transformer is further reduced and thus an apparent power of 903.878 kVA is freed up which can be used to supply energy to other users. This increases the power available at the secondary of the transformer, which improves access to electricity by reducing losses [3] [19] .

For these reasons, it is therefore appropriate to reduce energy consumption as much as possible, that is to say to have the highest possible power factor. According to the pricing applied by the electricity supplier, the minimum average monthly power factor must be 0.95 to avoid invoicing the increase for reactive consumption.

Below is the summary table of the results of the parameters obtained after improving the power factor (Table 2).

Table 2. Summary of results after analysis.

4. Conclusions

This work made it possible to know the electrical energy consumption of the various departures from the Mamou substation and to propose solutions for the compensation of the reactive energy called by these departures in order to reduce voltage drops and energy losses. In the energy context of our country, optimizing energy consumption through reactive energy compensation, which results in an 8.78% reduction in reactive energy consumption for departures from the Mamou substation, should not leave the indifferent authorities. This compensation provides for an annual gain on the fixed premium of $35432.0176. The remarkable results of this study are: the reduction of the subscribed power from 14913.978 KVA to 14010.100 KVA; the increase in the active power transported by the transformer from 8505.062 kW to 8962.323 kW; the reduction of the post load rate from 99.4% to 93.4%; the decrease in the voltage drop from 4.8% to 3.9%, the increase in the power available at the secondary of the transformer station at full load from 13950 KW to 14700 KW; the annual electrical energy saving of 339943.480 kWh.

Reducing the power factor from 0.93 to 0.98 further reduces the load on the secondary level of the supply transformer and thus frees up an apparent power of 903.878 kVA which can be used to supply power to other users. This increases the power available at the secondary of the transformer, which improves access to electricity [11] [20] [21] .

It is therefore essential that energy players are convinced of the need to install compensation devices to reduce or eliminate the negative impacts of the circulation of reactive energy on the networks [22] .

Acknowledgements

We would like to thank the staff of Electricité De Guinée in general, particularly the staff of the Mamou substation for the collaboration.

Conflicts of Interest

The authors declare no conflicts of interest regarding the publication of this paper.

References

[1] Mohsin, Q.K., Lin, X.N., Firas, F.M., Flaih, S.M. and Dawoud, M.K. (2016) Optimal Placement and Capacity of Capacitor Bank in Radial Distribution System. 2016 International Conference on Energy Efficient Technologies for Sustainability, Nagercoil, 7-8 April 2016, 416-423.
https://doi.org/10.1109/ICEETS.2016.7583791
[2] Soma, G.G. (2021) Optimal Sizing and Placement of Capacitor Banks in Distribution Networks Using a Genetic Algorithm. Electricity, 2, 187-204.
https://doi.org/10.3390/electricity2020012
[3] Goryunov, V., Girshin, S., Kuznetsov, E., et al., (2017) Optimal Sizing of Capacitor Banks to Reduce Power Losses with Accounting of Temperature Dependence of Bare Overhead Conductors. Proceedings of the 6th International Conference on Smart Cities and Green ICT Systems-SMARTGREENS, Porto, 22-24 April 2017, 174-179.
https://doi.org/10.5220/0006301101740179
[4] Téllez, A.A., Lopez, G., Isaac, I. and Gonzalez, J.W. (2018) Optimal Reactive Power Compensation in Electrical Distribution Systems with Distributed Resources. Review. Heliyon, 4, e00746.
https://doi.org/10.1016/j.heliyon.2018.e00746
[5] Montoya, O.D., Edwin, R.T. and Giral-Ramírez, D.A. (2022) Selection and Location of Fixed-Step Capacitor Banks in Distribution Grids for Minimization of Annual Operating Costs: A Two-Stage Approach. Computers, 11, Article 105.
https://doi.org/10.3390/computers11070105
[6] Gil-González, W., Montoya, O.D., Rajagopalan, A., Grisales-Norena L.F. and Hernández, J.C. (2020) Optimal Selection and Location of Fixed-Step Capacitor Banks in Distribution Networks Using a Discrete Version of the Vortex Search Algorithm. Energies, 13, Article 4914.
https://doi.org/10.3390/en13184914
[7] Aguila, A., Ortiz, L., Orizondo, R. and Lopez, G. (2021) Optimal Location and Dimensioning of Capacitors in Microgrids Using a Multicriteria Decision Algorithm. Heliyon, 7, e08061.
[8] Girshin, S.S., Bigun, A.A.Y., Mel’nikov, N.А. Petrova, E.V., Trotsenko, V.M., Osipov, D.S. and Goryunov, V.N. (2021) Loss of Energy in Electrical Networks with Capacitor Banks under Optimal Reactive Power Control. Przeglad Elektrotechniczny, 97, Article 133247.
https://doi.org/10.15199/48.2021.09.23
[9] Dalabeeh, A.K., Al-Ziod, A., Hindi, A., Al-Adwan, I., Khawaldah, M.A. and AL-Mofleh, A. (2016) Optimal Sizing and Location of the Capacitor Banks in a Radial Industrial Distribution System. Energy and Power, 6, 16-20.
[10] Recensement Général de la Population et de l’Habitat-Guinée (2018) Institut National des Statistiques-Guinée.
https://population.insguinee.org
[11] Abla, D., Gado, A. and El-Zeftawy, A.A. (2010) Impact of Reactive Power Control on Energy Savings of Electric Residential, Loads in Egypt. Proceedings of the 14th International Middle East Power Systems Conference, Giza, 19-21 December 2010, Article ID: 160.
[12] Statistiques annuelles de pointe de charge des artères de l’Electricité De Guinée.
https://edg.com.gn/
[13] Ismail, B., Wahab, N.I.A., Othman, M.L., Radzi, M.A.M., Vijyakumar, K.N. and Naain, M.N.M. (2020) A Comprehensive Review on Optimal Location and Sizing of Reactive Power Compensation Using Hybrid-Based Approaches for Power Loss Reduction, Voltage Stability Improvement, Voltage Profile Enhancement and Loadability Enhancement. IEEE Access, 8, 222733-222765.
https://doi.org/10.1109/ACCESS.2020.3043297
[14] Bel, B.A. (2020) Optimisation de la compensation de l’énergie réactive, mémoire de Master à visée de recherche, 125.
[15] Abdesselam, A. Modélisation et simulation des réseaux électriques.
https://sites.google.com/site/lmdelectrotechnique
[16] Li, Q.B. and Yin, H.S. (2019) Research on Reactive Power Compensation Capacity Allocation Scheme of 110 kV Substation. 2019 IEEE 2nd International Conference on Automation, Electronics and Electrical Engineering, Shenyang, 22-24 November 2019, 241-244.
https://doi.org/10.1109/AUTEEE48671.2019.9033289
[17] Circutor (2013) Solutions pour la compensation d’énergie réactive en Moyenne Tension.
[18] Technology, A. (2016) Compensation d’énergie réactive et maitrise de la qualité des infrastructures électriques. 80.
[19] Prah, I. and Attachie, J. (2022) Effect of Switching Devices on Power Quality and Transient Voltage Suppression Using Capacitor Bank Model. Journal of Power and Energy Engineering, 10, 77-89.
https://doi.org/10.4236/jpee.2022.105006
[20] Korunovic, L.M., Aleksandar, S. and Djokic, J.S.Z. (2019) Field-Based Evaluation of the Effects of Shunt Capacitors on the Operation of Distribution Transformers. IEEE Transactions on Power Delivery, 34, 680-689.
https://doi.org/10.1109/TPWRD.2019.2893588
[21] Zhang, J.F., Zhang, C.W. and Ma, D.Q. (2018) Substation Reactive Power Regulation Strategy. IOP Conference Series: Materials Science and Engineering, 301, Article 012117.
https://doi.org/10.1088/1757-899X/301/1/012117
[22] Akram, H. (2022) Control de tension et la puissance reactive dans RE en présence du système de compensation dynamique shunt. Mémoire de Master académique, 82.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.