Engineering
Volume 6, Issue 13 (December 2014)
ISSN Print: 1947-3931 ISSN Online: 1947-394X
Google-based Impact Factor: 0.66 Citations
A Branch-and-Bound Based Heuristic Algorithm for Minimizing Makespan in Machining-Assembly Flowshop Scheduling ()
Affiliation(s)
ABSTRACT
KEYWORDS
Share and Cite:
Cited by
Copyright © 2024 by authors and Scientific Research Publishing Inc.
This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.