Analysis of Nigerian Electricity Generation Multi Year Tariff Order Pricing Model

HTML  XML Download Download as PDF (Size: 1648KB)  PP. 541-554  
DOI: 10.4236/epe.2017.910038    1,776 Downloads   4,642 Views  Citations

ABSTRACT

The Multi Year Tariff Order (MYTO) is the Nigerian Electricity Regulatory Commission (NERC) pricing framework for determining the Nigerian Electricity Supply Industry (NESI) pricing model. One of the objectives of the NERC’s MYTO pricing model is to ensure regulated electricity end user tariff without compromising return on investment. Achieving this objective is imperative to attract investors in the growing Nigerian electricity market. However, NESI has hitherto been faced with challenges ranging from its inability to provide sufficient power to its customers to not being viable enough to provide return on capital invested. In this paper, sensitivity analysis of power plant operation and performance parameters on the cost of electricity (CoE) generation using MYTO (power generation) pricing model were evaluated. Thermodynamic modeling and simulation of an open cycle gas turbine (OCGT) was carried out to augment scarce data on power plant performance and operation in Nigeria. Sensitivity analysis was carried out using probabilistic method based on Monte Carlo simulation (MCS) implemented in commercial software (@ Risk®). The result highlighted sensitivity of the model input parameters to cost of electricity generation based on technical and financial assumptions of MYTO model. Seven most influential parameters affecting generation cost were identified. These parameters and their correlation coefficients are given as: 1) foreign exchange rate, 0.76; 2) cost of fuel, 0.51; 3) thermal efficiency, -0.23; 4) variable operation and maintenance cost, 0.22; 5) fixed operating and maintenance cost, -0.03; 6) capacity factor, -0.02; and 7) average capacity degradation, 0.01. Based on the gas turbine engine and input parameter distributions statistics for this study, the generation cost lies between 9.84 to 15.45 N/kWh and the probabilities of CoE within these values were established.

Share and Cite:

Anosike, N. , Dara, J. , Ngwaka, U. and Enemuoh, F. (2017) Analysis of Nigerian Electricity Generation Multi Year Tariff Order Pricing Model. Energy and Power Engineering, 9, 541-554. doi: 10.4236/epe.2017.910038.

Cited by

[1] ARTIFICIAL NEURAL NETWORK-BASED MODELING AND FORECASTING OF ELECTRICITY GENERATION IN NIGERIA
2021
[2] An Empirical Enquiry into Stakeholders' Perception of Electricity Pricing Methodology
2021
[3] An empirical enquiry into stakeholders perception of electricity pricing methodology
International Journal of Energy Economics and Policy, 2021
[4] Electricity pricing in the NESI: how effective has the MYTO 2015 been?
2021 IEEE PES/IAS PowerAfrica, 2021
[5] A Critical Review on Electric Power Sector for Sustainable Energy Development in Nigeria
2021
[6] Liberalization of the Electricity Sector: The Nigerian Experience
2020
[7] Evaluation of Operational Performance and Economic Analysis of a Gas Turbine Power Plant: A Case Study of Ibom Power Station
2019
[8] Nigeria's Energy Sector Privatization: Reforms, Challenges and Prospects
South Asian Research Journal of Humanities and Social Sciences, 2019
[9] The Tariff Value Chain: A Study of Three Customers of the Enugu Electricity Distribution Company
2019
[10] " Department of Banking and Finance, Plateau State Polytechnic Barkin Ladi" Department of Economics, Federal University of Lafia, Nassarawa State

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.