ABSTRACT

In the present paper the main results of the pre-operational studies related to the energization maneuver of a Half-Wavelength Transmission Line (AC-Link), are presented. The simulations were performed in PSCAD with actual Brazilian system data. Specifically the following studies were performed: electromagnetic transient studies of energization maneuver considering no fault and the occurrence of fault along the trunk; dynamic analysis of generator units that will energize the AC-Link; TRV on the circuit-breaker that will energize the trunk. The main conclusion is that the AC-Link energization experiment can be implemented without jeopardizing or causing time-life reduction of the equipment involved in the experiment, which comprises the generator unit that will energize the trunk, the step-up transformer, the arresters that will be kept during the experiments, as well as the circuit-breaker that will energize and then trip the AC-Link.

Share and Cite:

C. Machado Jr, M. Maia, E. Carvalho Jr, M. C. Tavares, J. B. Gertrudes, E. C. Gomes, W. Freitas, M. A. Paz, F. A. Moreira, C. A. Floriano, V. G. Machado and A. M. Mendes, "Energization of a Half-Wavelength Transmission Line - Pre-Operational Transients Studies," Energy and Power Engineering, Vol. 5 No. 4B, 2013, pp. 1456-1462. doi: 10.4236/epe.2013.54B276.

Cited by

[1] Performance evaluation of power differential protection applied to half-wavelength transmission lines
Electric Power Systems Research, 2022
[2] Behavior of the Single-Phase Auto-Reclosing in Half-Wavelength Transmission Line
International Conference on Power Systems Transients, 2019
[3] Single‐phase auto‐reclosing mitigation procedure for half‐wavelength transmission line
IET Generation, Transmission & …, 2017
[4] Single-Phase Auto Reclosing Mitigation Procedure for Half Wavelength Transmission Line
IET Generation, Transmission & Distribution, 2017
[5] Faulted Phase Selection for Half-Wavelength Power Transmission Lines
2017
[6] Linha de transmissão de pouco mais de meio comprimento de onda com multiterminais na recepção
2017
[7] Single-phase auto-reclosing mitigation procedure for half-wavelength transmission line
2017
[8] Typical Motion and Extinction Characteristics of the Secondary Arcs Associated with Half-Wavelength Transmission Lines
?Plasma Science and Technology?, 2014

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.