Journal of Software Engineering and Applications

Volume 3, Issue 12 (December 2010)

ISSN Print: 1945-3116   ISSN Online: 1945-3124

Google-based Impact Factor: 1.22  Citations  h5-index & Ranking

Weighted Multi-Skill Resources Project Scheduling

HTML  Download Download as PDF (Size: 67KB)  PP. 1125-1130  
DOI: 10.4236/jsea.2010.312131    5,801 Downloads   10,642 Views  Citations

Affiliation(s)

.

ABSTRACT

In this paper, we present an extension of the classical Resource Constrained Project Scheduling Problem (RCPSP). We present a new type of resource constraints in which staff members are involved. We present a new model where staff members can have several skills with different proficiency, i.e., a staff member is able to perform more than one kind of activity as well as the time need is complete the task assign depends on the staff individual skill. We call this model the Weighted-Multi-Skill Project Scheduling Problem (WMSPSP). In our model, an activity has specific skill requirements that must be satisfied. To solve this problem, we propose a lower bound that uses a linear programming scheme for the RCPSP.

Share and Cite:

Al-Anzi, F. , Al-Zame, K. and Allahverdi, A. (2010) Weighted Multi-Skill Resources Project Scheduling. Journal of Software Engineering and Applications, 3, 1125-1130. doi: 10.4236/jsea.2010.312131.

Cited by

[1] Multi-skill resource constrained project scheduling using a multi-objective discrete Jaya algorithm
Applied Intelligence, 2022
[2] Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches
Computers & Industrial Engineering, 2022
[3] Work, food, rent, television: The role of lifestyles and experiences on household energy behaviour in rural Lagos, Nigeria
Energy Research & Social Science, 2021
[4] An integer programming formulation for a fair tournament scheduling in TeamGym in Iceland
2021
[5] A decomposition-based multi-objective genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem
2021
[6] Multi-skilling in scheduling problems: A review on models, methods and applications
Nadjafi - Computers & Industrial Engineering, 2021
[7] A general variable neighbourhood search for multi-skill resource-constrained project scheduling problem with step-deterioration
2020
[8] Novel Feedback-based Operators in Solving Multi-skill Resource-Constrained Project Scheduling Problem
2020
[9] A new approach to determine the weights of project activities using data envelopment analysis: a case of Mobarakeh steel company
2020
[10] A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem
2020
[11] Management of the designe process: human resource allocation in factory of the future
2019
[12] Preemptive multi-skilled resource constrained project scheduling problem with hard/soft interval due dates
2019
[13] Applying resource-leveling strategy for solving Multi-Skill Resource-Constrained Project Scheduling Problem
2019
[14] A general variable neighborhood search based on path relinking algorithm for multi-skill resource-constrained project scheduling problem with multiple restrictions
2019
[15] Selection of design project with the consideration of designers' satisfaction factors and collaboration ability
2019
[16] A Memetic Algorithm for Multiskill Resource-Constrained Project Scheduling Problem under Linear Deterioration
2019
[17] A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem
2019
[18] Taking the circus out of scheduling: An application from the big top
Journal of LATEX Templates, 2019
[19] An Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling …
2019
[20] Efficient genetic algorithms for optimal assignment of tasks to teams of agents
Neurocomputing, 2018
[21] A decomposition solution approach to the troops-to-tasks assignment in military peacekeeping operations
2018
[22] Hybrid Differential Evolution and Greedy Algorithm (DEGR) for solving Multi-Skill Resource-Constrained Project Scheduling Problem
Applied Soft Computing, 2018
[23] Solving a Multi-Objective Mathematical Model for a Multi-Skilled Project Scheduling Problem by Particle Swarm Optimization and Differential Evolution Algorithms
Industrial Engineering & Management Systems, 2017
[24] 13 Simulation und Optimierung komplexer Dienstleistungsprojekte
2017
[25] Solving a Multi-Objective Mathematical Model for a Multi-Skilled Project Scheduling Problem by Particle Swarm Optimization and Differential Evolution …
2017
[26] A knowledge-guided multi-objective fruit fly optimization algorithm for the multi-skill resource constrained project scheduling problem
Swarm and Evolutionary Computation, 2017
[27] GRASP Applied to Multi–Skill Resource–Constrained Project Scheduling Problem
Computational Collective Intelligence, 2016
[28] Simulation und Optimierung komplexer Dienstleistungsprojekte
Produktivit?tsmanagement von Dienstleistungen, 2016
[29] A knowledge-based fruit fly optimization algorithm for multi-skill resource-constrained project scheduling problem
Control Conference (CCC), 2015 34th Chinese, 2015
[30] A new benchmark dataset for Multi-Skill Resource-Constrained Project Scheduling Problem
Computer Science and Information Systems (FedCSIS), 2015 Federated Conference on, 2015
[31] An Actor-Oriented Model of a Service Provision
2015
[32] Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem
Soft Computing, 2014
[33] A Review of Resource-Constrained Project Scheduling Problems (RCPSP) Approaches and Solutions
2014
[34] Considering the flexibility of human resources in planning and scheduling industrial activities
2013
[35] Prise en compte de la flexibilité des ressources humaines dans la planification et l'ordonnancement des activités industrielles
2013
[36] A RESOURCE CONSTRAINED PROJECT SCHEDULING MODEL BASED ON JOB PROFILE SCHEMES
2013
[37] A RESOURCE CONSTRAINED PROJECT SCHEDULING MODEL BASED ON JOB PROFILE SCHEMES.
Acta Technica Napocensis. Electronica-Telecomunicatii, 2013
[38] An Adaptive Genetic Algorithm for the Multi-skill Project Scheduling
Database, 2013
[39] 0RÏSENTÏE ET SOUTENUE PAR
2011

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.