Smart Grid and Renewable Energy
Volume 4, Issue 1 (February 2013)
ISSN Print: 2151-481X ISSN Online: 2151-4844
Google-based Impact Factor: 0.88 Citations
Wind Energy Conversion Systems Adapted to the Tunisian Sites ()
Affiliation(s)
ABSTRACT
The choice of a wind turbine for a given site is a very significant operation. It is advised to make an in-depth study on the characteristics of the aerogenerator and the implantation site before any installation of a wind farm for choosing well the system best adapted to the energy needs. The objective of this study is to sensitize the users of the wind energy on the various problems involved in the aerogenerator installation on any site and to provide a decision-making aid to the judicious choice of the wind system best adapted. The idea is to estimate, for a selected implantation site, the energy production and the operating time of several wind systems. We can thus select the aerogenerator best adapted by making a compromise between a maximum recovery of energy and a high time of production. The influence height of the aerogenerator on energy profitability is also studied. We apply this step to the twenty six Tunisian synoptic sites by implantation scenarios of seven wind systems of various nominal speeds in function of the height.
KEYWORDS
Share and Cite:
Cited by
Copyright © 2024 by authors and Scientific Research Publishing Inc.
This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.