[1]
|
The spatial structure of labour force employment in China’s industries: Measurement and extraction
Economic Analysis and Policy,
2023
DOI:10.1016/j.eap.2022.12.001
|
|
|
[2]
|
Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning
Automation in Construction,
2023
DOI:10.1016/j.autcon.2023.104817
|
|
|
[3]
|
Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning
Automation in Construction,
2023
DOI:10.1016/j.autcon.2023.104817
|
|
|
[4]
|
Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning
Automation in Construction,
2023
DOI:10.1016/j.autcon.2023.104817
|
|
|
[5]
|
Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning
Automation in Construction,
2023
DOI:10.1016/j.autcon.2023.104817
|
|
|
[6]
|
Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning
Automation in Construction,
2023
DOI:10.1016/j.autcon.2023.104817
|
|
|
[7]
|
A Practical Staff Scheduling Strategy Considering Various Types of Employment in the Construction Industry
Algorithms,
2022
DOI:10.3390/a15090321
|
|
|
[8]
|
Optimal profitable applications for web development companies using a linear programming approach
International Journal of ADVANCED AND APPLIED SCIENCES,
2022
DOI:10.21833/ijaas.2022.08.008
|
|
|
[9]
|
A Practical Staff Scheduling Strategy Considering Various Types of Employment in the Construction Industry
Algorithms,
2022
DOI:10.3390/a15090321
|
|
|
[10]
|
Logistic models to minimize the material handling cost within a cross-dock
Mathematical Biosciences and Engineering,
2022
DOI:10.3934/mbe.2023146
|
|
|
[11]
|
Analysis and Improvement of Late Completion of Aircraft Engine Maintenance Using Fuzzy PERT/CPM With Limited Resources
International Journal of Knowledge and Systems Science,
2022
DOI:10.4018/IJKSS.291973
|
|
|
[12]
|
Analysis and Improvement of Late Completion of Aircraft Engine Maintenance Using Fuzzy PERT/CPM With Limited Resources
International Journal of Knowledge and Systems Science,
2021
DOI:10.4018/IJKSS.291973
|
|
|
[13]
|
Optimisation approaches and challenges of personnel deployment for movie exhibitors
Journal of Media Business Studies,
2020
DOI:10.1080/16522354.2020.1832745
|
|
|
[14]
|
A Review of Optimization Algorithms for University Timetable Scheduling
Engineering, Technology & Applied Science Research,
2020
DOI:10.48084/etasr.3832
|
|
|
[15]
|
Optimal Alternatives by Controlling Time and Cost of a Multi-Level Car Park Using Excel-Solver Program
Journal of Southwest Jiaotong University,
2019
DOI:10.35741/issn.0258-2724.54.6.45
|
|
|