[1]
|
Critical Risks to Construction Cost Estimation
Journal of Engineering, Project, and Production Management,
2021
DOI:10.2478/jeppm-2021-0003
|
|
|
[2]
|
Regression Model of Shop-house Construction Costs and Percentage of Building Component Costs
2019 5th International Conference on Computing Engineering and Design (ICCED),
2019
DOI:10.1109/ICCED46541.2019.9161131
|
|
|
[3]
|
What are the Dominant Factors of Students’ Productive Skills in Construction Services?
IOP Conference Series: Materials Science and Engineering,
2018
DOI:10.1088/1757-899X/306/1/012111
|
|
|
[4]
|
Fuzzy Hybrid Computing in Construction Engineering and Management
2018
DOI:10.1108/978-1-78743-868-220181010
|
|
|
[5]
|
Conceptual Estimation of Cost Significant Model on Shop-Houses Construction
2018 International Conference on Computing, Engineering, and Design (ICCED),
2018
DOI:10.1109/ICCED.2018.00044
|
|
|
[6]
|
Estimated budget construction housing using linear regression model easy and fast solutions accurate
2017 International Conference on Computing, Engineering, and Design (ICCED),
2017
DOI:10.1109/CED.2017.8308095
|
|
|