American Journal of Industrial and Business Management

American Journal of Industrial and Business Management

ISSN Print: 2164-5167
ISSN Online: 2164-5175
www.scirp.org/journal/ajibm
E-mail: ajibm@scirp.org
"Risk Factor Empirical Research of PPP Projects Based on Factor Analysis Method"
written by Hang Yin, Yuan-Fu Li, Dong-Mei Zhao,
published by American Journal of Industrial and Business Management, Vol.5 No.6, 2015
has been cited by the following article(s):
  • Google Scholar
  • CrossRef
[1] Determining the critical risk factors of implementing public–private partnership in water and wastewater infrastructure facilities: Perspectives of private and public …
Buildings, 2023
[2] Risk analysis of water and wastewater infrastructure projects based on public-private partnership (3P) approach by combining Fuzzy Delphi (FD), FMEA and artificial …
Journal of Structural and Construction …, 2023
[3] تحلیل ریسک‌های پروژه‌های زیربنایی آب و فاضلاب مبتنی بر رویکرد مشارکت عمومی-خصوصی (3P) با تلفیق تکنیک‌های دلفی فازی (FD)، FMEA و ارزیابی مصنوعی فازی …‎
مهندسی سازه و ساخت, 2023
[4] Risk Identification and Prioritization in Public-Private Partnership Water Transfer Projects (Case Study: Water Transfer Project to Safadasht Lands)
Journal of Water and …, 2022
[5] Public-Private-Partnership Model for Infrastructure Projects
2021
[6] Public Private Partnership Model for Infrastructure Projects
2021
[7] Analyzing the risk factors of private–public partnerships for water supply projects using fuzzy synthetic evaluation: a case study of Iranian water supply projects
2018
[8] Analyzing the risk factors of private–public partnerships for water supply projects using fuzzy synthetic evaluation: a case study of Iranian water supply …
2018
[9] Model Selection Based on Bayes Factor/Seleção de modelo com base no Bayes Factor
2017
[10] Evaluation and Ranking of Public-Private Partnership Risk Factors in Water supply Projects, Using FMEA and Fuzzy Synthetic Evaluation Methods: A Case Study of …
2017
[11] Evaluation and ranking of public-private partnership risk factors in water supply projects, using FMEA and Fuzzy synthetic evaluation methods: a case study of Qom
Iran-Water Resources Research, 2017
[12] Analyzing the risk factors of private-public partnerships for water supply projects using fuzzy synthetic evaluation: a case study of Iranian water supply projects
2017
Free SCIRP Newsletters
Copyright © 2006-2024 Scientific Research Publishing Inc. All Rights Reserved.
Top