[1]
|
A fuzzy multi objective inventory model of demand dependent deterioration including lead time
|
|
J Fuzzy Extension Appl,
2022 |
|
|
[2]
|
Neutrosophic multi-item inventory control models with constraints
|
|
Journal of Intelligent & Fuzzy Systems,
2022 |
|
|
[3]
|
Persediaan Bahan Baku Menggunakan Aplikasi Teori Himpunan Fuzzy EOQ Multi Item Pada Perusahaan Kerudung
|
|
Jurnal Optimasi Teknik …,
2022 |
|
|
[4]
|
Optimization of inventory in agriculture material processing industry by using multi-item deterministic model
|
|
2021 |
|
|
[5]
|
Multi item inventory model include lead time with demand dependent production cost and set-up-cost in fuzzy environment
|
|
2020 |
|
|
[6]
|
A New Fuzzy Multiobjective Geometric Programming in Double Sampling in Presence of Non-Response
|
|
2020 |
|
|
[7]
|
Global optimisation for a developed price discrimination model: A signomial geometric programming-based approach
|
|
2020 |
|
|
[8]
|
Modified signomial geometric programming (MSGP) and its applications
|
|
2019 |
|
|
[9]
|
Multi-Objective Supply Chain Inventory Model with Demand Dependent Purchase Cost and Production Rate Dependent Production Cost.
|
|
2019 |
|
|
[10]
|
Multi-Objective Two Echelon Supply Chain Inventory Model with Lot Size and Customer Demand Dependent Purchase Cost and Production Rate Dependent …
|
|
2019 |
|
|
[11]
|
Multi-objective two echelon supply chain inventory model with lot size and customer demand dependent purchase cost and production rate dependent production cost
|
|
2019 |
|
|
[12]
|
Multi-objective supply chain inventory model with demand dependent purchase cost and production rate dependent production cost
|
|
Pakistan Journal of Statistics and Operation …,
2019 |
|
|
[13]
|
Multi Item Inventory Model with Uncertain Lead Time and Varying Holding Cost via Geometric Programming; A Fuzzy Approach
|
|
2018 |
|
|
[14]
|
Multi Item Fuzzy Inventory Model for Imperfect Items with Uncertain Lead Time and Unreliable Holding Cost; A Geometric Programming Approach
|
|
2018 |
|
|
[15]
|
A two-bar truss structural model under uncertainty: a uncertain chance constrained geometric programming (UCCGP) approach
|
|
International Journal on Interactive Design and Manufacturing (IJIDeM),
2018 |
|
|
[16]
|
A Bell Shaped Fuzzy Economic Order Quantity () EOQ Model with Constant Demand, Shortages under Fully Backlogged
|
|
2018 |
|
|
[17]
|
PERANCANGAN MODEL PENENTUAN JUMLAH PEMESANAN DAN REORDER POINT MENGGUNAKAN FUZZY INVENTORY CONTROL TERHADAP NILAI …
|
|
2018 |
|
|
[18]
|
A fuzzy inventory model with unit production cost, time depended holding cost, with-out shortages under a space constraint: a parametric geometric programming …
|
|
2017 |
|
|
[19]
|
STUDI PERANCANGAN MODEL PENENTUAN JUMLAH PEMESANAN DAN REORDER POINT MENGGUNAKAN FUZZY INVENTORY CONTROL TERHADAP …
|
|
2017 |
|
|
[20]
|
Fuzzy EOQ model with constant demand and shortages: A fuzzy signomial geometric programming (FSGP) approach
|
|
2017 |
|
|
[21]
|
A FUZZY INVENTORY MODEL (EOQ MODEL) WITH UNIT PRODUCTION COST, TIME DEPENDED HOLDING COST, WITHOUT SHORTAGES UNDER A …
|
|
Independent Journal of Management & Production,
2017 |
|
|
[22]
|
A fuzzy inventory model with unit production cost, time depended holding cost, with-out shortages under a space constraint: a parametric geometric programming approach
|
|
New Trends in Mathematical Sciences,
2017 |
|
|
[23]
|
A Bell Shaped Fuzzy Inventory Model and Its Application using a Possibilistic Approach
|
|
2017 |
|
|
[24]
|
A fuzzy inventory model with unit production cost, time depended holding cost, with-out shortages under a space constraint: a parametric geometric …
|
|
2017 |
|
|
[25]
|
A Fuzzy EOQ Model With Unit Production Cost, Time Depended Holding Cost, With-Out Shortages Under A Space Constraint: A Fuzzy Geometric Programing (FGP) Approach
|
|
Oxford Journal of Intelligent Decision and Data Science,
2017 |
|
|
[26]
|
A fuzzy inventory model (EOQ Model) with unit production cost, time depended holding cost, without shortages under a space constraint: A fuzzy parametric …
|
|
2017 |
|
|
[27]
|
An integrated production-marketing planning model With Cubic production cost function and imperfect production process
|
|
2017 |
|
|
[28]
|
STUDI PERANCANGAN MODEL PENENTUAN JUMLAH PEMESANAN DAN REORDER POINT MENGGUNAKAN FUZZY INVENTORY CONTROL TERHADAP …
|
|
2017 |
|
|
[29]
|
A Fuzzy EOQ Model With Unit Production Cost, Time Depended Holding Cost, With-Out Shortages Under A Space Constraint: A Fuzzy Geometric Programing …
|
|
2017 |
|
|
[30]
|
Studi Perancangan Model Penentuan Jumlah Pemesanan Dan Reorder Point Menggunakan Fuzzy Inventory Control Terhadap Nilai Persediaan
|
|
2017 |
|
|
[31]
|
Fuzzy unconstrained Parametric Geometric programming problem and its application
|
|
2016 |
|
|
[32]
|
Fuzzy EOQ Model for Deteriorating Items, with Constant Demand, Shortages, and Fully Backlogging
|
|
2016 |
|
|
[33]
|
A Novel Method for Optimal Solution of Fuzzy Chance Constraint Single-Period Inventory Model
|
|
Advances in Fuzzy Systems,
2016 |
|
|
[34]
|
Fuzzy EOQ Model For Deteriorating Items, With Constant Demand, Shortages and Fully Backlogging
|
|
Oxford Journal of Intelligent Decision and …,
2016 |
|
|
[35]
|
Optimization Of Multi Objective Fuzzy Integrated Inventory Model With Demand Dependent Unit Cost And Lead Time Constraints.
|
|
International Journal of Applied Engineering Research,
2015 |
|
|
[36]
|
Fuzzy Geometric Programming Approach in Multivariate Stratified Sample Surveys Under Two Stage Randomized Response Model
|
|
Journal of Mathematical Modelling and Algorithms in Operations Research,
2015 |
|
|
[37]
|
Multi-objective geometric programming approach in multivariate stratified sample survey with quadratic cost function
|
|
Journal of Statistical Computation and Simulation,
2015 |
|
|
[38]
|
Optimal quality level, order quantity and selling price for the retailer
|
|
Mentoring & Tutoring: Partnership in Learning,
2014 |
|
|
[39]
|
Joint pricing and production management: a geometric programming approach with consideration of cubic production cost function
|
|
Journal of Industrial Engineering International,
2014 |
|
|
[40]
|
Multi Objective Fuzzy Inventory Model with Demand Dependent Unit Cost and Lead Time Constraints–A Karush Kuhn Tucker Conditions Approach
|
|
NULL
2014 |
|
|
[41]
|
Optimal quality level, order quantity and selling price for the retailer in a two-level supply chain
|
|
Journal of Management Analytics,
2014 |
|
|
[42]
|
STATISTICAL QUALITY CONTROL OF MULTI-ITEM EOQ MODEL WITH VARYING LEADING TIME VIA LAGRANGE METHOD�
|
|
International Journal of Mathematical Archive (IJMA) ,
2013 |
|
|
[43]
|
Concurrent Multi-Part Multi-Event design refresh planning models incorporating solution requirements and part-unique temporal constraints
|
|
NULL
2012 |
|
|
[44]
|
Aplicação de programação geométrica para solução de problemas de estoques com múltiplos objetivos
|
|
2012 |
|
|
[45]
|
APPLICATION OF MULTI-ITEMS INVENTORY MODELS IN COURSE MATERIALS MANAGEMENT: TOWARDS BUILDING A DECISION SUPPORT SYSTEM …
|
|
|
|
|