[1]
|
Variation orders during execution of construction infrastructure projects: case study of an electricity company
|
|
Katumba… - South African Journal of …,
2024 |
|
|
[2]
|
Planning in the front end of flagship projects post-disaster: a Canterbury earthquake study: a thesis presented in partial fulfilment of the requirements for …
|
|
2022 |
|
|
[3]
|
Towards a generalizable project readiness assessment methodology for the mining industry
|
|
2022 |
|
|
[4]
|
Front End Engineering (FEE) Application in Baronia Field
|
|
Recent Trends in Civil Engineering …,
2022 |
|
|
[5]
|
Elétrica. Approved by the Examination Committee.
|
|
2022 |
|
|
[6]
|
Front-End Planning for Pipeline Construction Projects
|
|
2022 |
|
|
[7]
|
Towards a generalizable project readiness assessment methodology for the mining industry: A literature review
|
|
Journal of the Southern African Institute of …,
2022 |
|
|
[8]
|
A review of readiness assessments for mining projects
|
|
Journal of the Southern African Institute of …,
2022 |
|
|
[9]
|
How do specialists express risks: an applied ontology for the oil & gas domain.
|
|
ONTOBRAS,
2021 |
|
|
[10]
|
Examination Committee.
|
|
2021 |
|
|
[11]
|
Infrastructure Project Selection & Prioritization: Challenges in the Front-End Planning Phase
|
|
2021 |
|
|
[12]
|
Building a model to improve front end project conceptualisation: introducing the Project Conceptualisation Canvas
|
|
2020 |
|
|
[13]
|
A front end planning decision-making framework for infrastructure project selection and prioritisation in Indonesia
|
|
2020 |
|
|
[14]
|
A method for decommissioning strategy proposal and a cost estimation considering a multiple reactor site with interdependent plants
|
|
2020 |
|
|
[15]
|
Rodrigo Mendes Gandra
|
|
2019 |
|
|
[16]
|
A new management tool and mathematical model for decommissioning cost estimation of multiple reactors site
|
|
2019 |
|
|
[17]
|
Mineral project design using ABC methodology and dynamic simulation.
|
|
2019 |
|
|
[18]
|
A Methodology to Use Multi-Objective Optimization Criteria for an Offshore Topside Production System Since the Early Design Stages, and for The Unit Life …
|
|
2019 |
|
|
[19]
|
Retrospective look on front-end planning in the construction industry: A literature review of 30 years of research
|
|
INTERNATIONAL JOURNAL OF CONSTRUCTION SUPPLY CHAIN MANAGEMENT,
2019 |
|
|
[20]
|
Modelo de integração das questões sociais no desenvolvimento de megaprojetos no setor de mineração: um caminho para a construção da licença social para …
|
|
2019 |
|
|
[21]
|
Balanced Maturity Model for Oil and Gas Portfolio of Assets
|
|
2018 |
|
|
[22]
|
Economic advantages of dynamic analysis in the early stages of mining projects
|
|
2018 |
|
|
[23]
|
IMPLEMENTATION OF PDRI DURING FRONT-END PLANNING: A STRATEGY TO IMPROVE INDONESIA'S MARITIME INFRASTRUCTURE PROJECT …
|
|
2018 |
|
|
[24]
|
Developing a Conceptual Framework for Making Decision during Front-End Planning Phase to Select Infrastructure Projects
|
|
Conference Paper,
2018 |
|
|
[25]
|
Implementation of PDRI during Front-end Planning: A Strategy to Improve Indonesia's Maritime Infrastructure Project Performance
|
|
2018 |
|
|
[26]
|
IMPLEMENTAÇÃO DE UM MODELO DE GERENCIAMENTO DE PROJETOS UTILIZANDO METODOLOGIA FEL: ESTUDO DE CASO COM UM …
|
|
2017 |
|
|
[27]
|
IMPLEMENTAÇÃO DE UM MODELO DE GERENCIAMENTO DE PROJETOS UTILIZANDO METODOLOGIA FEL: ESTUDO DE CASO COM UM …
|
|
2017 |
|
|
[28]
|
Implementação de um modelo de gerenciamento de projetos utilizando metodologia fel: estudo de caso com um Microempreendedor Individual (MEI)
|
|
Revista de Administração e Contabilidade-RAC,
2017 |
|
|
[29]
|
The selection of generic data for a reliability study in the design of an offshore system
|
|
2017 |
|
|
[30]
|
Developing a framework to structure and improve the decision-making process from an asset manager perspective: A study towards the information flow …
|
|
2016 |
|
|
[31]
|
An Overview of Front-End Planning for Construction Projects
|
|
International Research Journal of Engineering and Technology,
2016 |
|
|
[32]
|
Developing a framework to structure and improve the decision-making process from an asset manager perspective: A study towards the information flow for …
|
|
2016 |
|
|
[33]
|
Towards a generalizable project readiness assessment methodology for the mining industry: A literature
|
|
|
|
|
[34]
|
„Stundum er þetta frábært, stundum alls ekki “. Upplifun starfsfólks nýskapandi hugbúnaðarfyrirtækja á Agile.
|
|
|
|
|