American Journal of Industrial and Business Management

American Journal of Industrial and Business Management

ISSN Print: 2164-5167
ISSN Online: 2164-5175
www.scirp.org/journal/ajibm
E-mail: ajibm@scirp.org
"Megaprojects Front-End Planning: The Case of Brazilian Organizations of Engineering and Construction"
written by Otávio Mansur Motta, Osvaldo Luiz Gonçalves Quelhas, José Rodrigues de Farias Filho, Sérgio França, Marcelo Meirino,
published by American Journal of Industrial and Business Management, Vol.4 No.8, 2014
has been cited by the following article(s):
  • Google Scholar
  • CrossRef
[1] A method for decommissioning strategy proposal and a cost estimation considering a multiple reactor site with interdependent plants
2020
[2] Building a model to improve front end project conceptualisation: introducing the Project Conceptualisation Canvas
2020
[3] Modelo de integração das questões sociais no desenvolvimento de megaprojetos no setor de mineração: um caminho para a construção da licença social para …
2019
[4] Rodrigo Mendes Gandra
2019
[5] A new management tool and mathematical model for decommissioning cost estimation of multiple reactors site
2019
[6] Mineral project design using ABC methodology and dynamic simulation.
2019
[7] A Methodology to Use Multi-Objective Optimization Criteria for an Offshore Topside Production System Since the Early Design Stages, and for The Unit Life …
2019
[8] Retrospective look on front-end planning in the construction industry: A literature review of 30 years of research
INTERNATIONAL JOURNAL OF CONSTRUCTION SUPPLY CHAIN MANAGEMENT, 2019
[9] Balanced Maturity Model for Oil and Gas Portfolio of Assets
2018
[10] Economic advantages of dynamic analysis in the early stages of mining projects
2018
[11] IMPLEMENTATION OF PDRI DURING FRONT-END PLANNING: A STRATEGY TO IMPROVE INDONESIA'S MARITIME INFRASTRUCTURE PROJECT …
2018
[12] Developing a Conceptual Framework for Making Decision during Front-End Planning Phase to Select Infrastructure Projects
Conference Paper, 2018
[13] Implementation of PDRI during Front-end Planning: A Strategy to Improve Indonesia's Maritime Infrastructure Project Performance
2018
[14] IMPLEMENTAÇÃO DE UM MODELO DE GERENCIAMENTO DE PROJETOS UTILIZANDO METODOLOGIA FEL: ESTUDO DE CASO COM UM …
2017
[15] IMPLEMENTAÇÃO DE UM MODELO DE GERENCIAMENTO DE PROJETOS UTILIZANDO METODOLOGIA FEL: ESTUDO DE CASO COM UM …
2017
[16] Developing a framework to structure and improve the decision-making process from an asset manager perspective: A study towards the information flow …
2016
[17] An Overview of Front-End Planning for Construction Projects
International Research Journal of Engineering and Technology, 2016
[18] Developing a framework to structure and improve the decision-making process from an asset manager perspective: A study towards the information flow for …
2016
[19] DEVELOPING A CONCEPTUAL FRAMEWORK FOR MAKING DECISION DURING FRONT-END PLANNING PHASE TO SELECT INFRASTRUCTURE …
[20] Infrastructure Project Selection & Prioritization: Challenges in the Front-End Planning Phase
Free SCIRP Newsletters
Copyright © 2006-2022 Scientific Research Publishing Inc. All Rights Reserved.
Top