Journal of Software Engineering and Applications

Journal of Software Engineering and Applications

ISSN Print: 1945-3116
ISSN Online: 1945-3124
www.scirp.org/journal/jsea
E-mail: jsea@scirp.org
"Weighted Multi-Skill Resources Project Scheduling"
written by Fawaz S. Al-Anzi, Khaled Al-Zame, Ali Allahverdi,
published by Journal of Software Engineering and Applications, Vol.3 No.12, 2010
has been cited by the following article(s):
  • Google Scholar
  • CrossRef
[1] Multi-skill resource constrained project scheduling using a multi-objective discrete Jaya algorithm
Applied Intelligence, 2022
[2] Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches
Computers & Industrial Engineering, 2022
[3] Work, food, rent, television: The role of lifestyles and experiences on household energy behaviour in rural Lagos, Nigeria
Energy Research & Social Science, 2021
[4] An integer programming formulation for a fair tournament scheduling in TeamGym in Iceland
2021
[5] A decomposition-based multi-objective genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem
2021
[6] Multi-skilling in scheduling problems: A review on models, methods and applications
Nadjafi - Computers & Industrial Engineering, 2021
[7] A general variable neighbourhood search for multi-skill resource-constrained project scheduling problem with step-deterioration
2020
[8] Novel Feedback-based Operators in Solving Multi-skill Resource-Constrained Project Scheduling Problem
2020
[9] A new approach to determine the weights of project activities using data envelopment analysis: a case of Mobarakeh steel company
2020
[10] A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem
2020
[11] Management of the designe process: human resource allocation in factory of the future
2019
[12] Preemptive multi-skilled resource constrained project scheduling problem with hard/soft interval due dates
2019
[13] Applying resource-leveling strategy for solving Multi-Skill Resource-Constrained Project Scheduling Problem
2019
[14] A general variable neighborhood search based on path relinking algorithm for multi-skill resource-constrained project scheduling problem with multiple restrictions
2019
[15] Selection of design project with the consideration of designers' satisfaction factors and collaboration ability
2019
[16] A Memetic Algorithm for Multiskill Resource-Constrained Project Scheduling Problem under Linear Deterioration
2019
[17] A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem
2019
[18] Taking the circus out of scheduling: An application from the big top
Journal of LATEX Templates, 2019
[19] An Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling …
2019
[20] Efficient genetic algorithms for optimal assignment of tasks to teams of agents
Neurocomputing, 2018
[21] A decomposition solution approach to the troops-to-tasks assignment in military peacekeeping operations
2018
[22] Hybrid Differential Evolution and Greedy Algorithm (DEGR) for solving Multi-Skill Resource-Constrained Project Scheduling Problem
Applied Soft Computing, 2018
[23] Solving a Multi-Objective Mathematical Model for a Multi-Skilled Project Scheduling Problem by Particle Swarm Optimization and Differential Evolution Algorithms
Industrial Engineering & Management Systems, 2017
[24] 13 Simulation und Optimierung komplexer Dienstleistungsprojekte
2017
[25] Solving a Multi-Objective Mathematical Model for a Multi-Skilled Project Scheduling Problem by Particle Swarm Optimization and Differential Evolution …
2017
[26] A knowledge-guided multi-objective fruit fly optimization algorithm for the multi-skill resource constrained project scheduling problem
Swarm and Evolutionary Computation, 2017
[27] GRASP Applied to Multi–Skill Resource–Constrained Project Scheduling Problem
Computational Collective Intelligence, 2016
[28] Simulation und Optimierung komplexer Dienstleistungsprojekte
Produktivit?tsmanagement von Dienstleistungen, 2016
[29] A knowledge-based fruit fly optimization algorithm for multi-skill resource-constrained project scheduling problem
Control Conference (CCC), 2015 34th Chinese, 2015
[30] A new benchmark dataset for Multi-Skill Resource-Constrained Project Scheduling Problem
Computer Science and Information Systems (FedCSIS), 2015 Federated Conference on, 2015
[31] An Actor-Oriented Model of a Service Provision
2015
[32] Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem
Soft Computing, 2014
[33] A Review of Resource-Constrained Project Scheduling Problems (RCPSP) Approaches and Solutions
2014
[34] Considering the flexibility of human resources in planning and scheduling industrial activities
2013
[35] Prise en compte de la flexibilité des ressources humaines dans la planification et l'ordonnancement des activités industrielles
2013
[36] A RESOURCE CONSTRAINED PROJECT SCHEDULING MODEL BASED ON JOB PROFILE SCHEMES
2013
[37] A RESOURCE CONSTRAINED PROJECT SCHEDULING MODEL BASED ON JOB PROFILE SCHEMES.
Acta Technica Napocensis. Electronica-Telecomunicatii, 2013
[38] An Adaptive Genetic Algorithm for the Multi-skill Project Scheduling
Database, 2013
[39] 0RÏSENTÏE ET SOUTENUE PAR
2011
Free SCIRP Newsletters
Copyright © 2006-2024 Scientific Research Publishing Inc. All Rights Reserved.
Top