"Hydro Matrix Power Wheels Generate More than 5 GW/h from Main Branch Canals (River Nile) in Egypt"
written by Hesham F. A. Hamed, Ahmed M. Kassem, Medhat E. M. Ali,
published by Journal of Power and Energy Engineering, Vol.4 No.3, 2016
has been cited by the following article(s):
  • Google Scholar
  • CrossRef