Annual Production Plan of Mine Based on Linear Programming

HTML  XML Download Download as PDF (Size: 404KB)  PP. 1-6  
DOI: 10.4236/oalib.1104651    748 Downloads   1,907 Views  

ABSTRACT

In order to solve the difficulty of the arrangement of ore production at each mine site during the transition from open pit to underground mining in Shirengou iron mine. Taking the largest amount of mining as the objective function, each deposit storage capacity, ore dilution rate, ore loss rate and grade as the constraints, thus the linear programming model was established and solved by lingo considering the balance between reserve and production ratio. The optimal number of each mining area mining was obtained, providing a theoretical basis for raising the overall economic benefits of mining transition period.

Share and Cite:

Jiang, S. , Zhang, Z. and Sang, Q. (2018) Annual Production Plan of Mine Based on Linear Programming. Open Access Library Journal, 5, 1-6. doi: 10.4236/oalib.1104651.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.