Performance Evaluation of Sediment Basins: Case Study of Keya Hydropower Plant in Rwanda

HTML  XML Download Download as PDF (Size: 3068KB)  PP. 1387-1398  
DOI: 10.4236/jwarp.2015.716112    4,786 Downloads   6,783 Views  Citations

ABSTRACT

Keya Hydropower Plant (HPP) is a run-off-river plant which can be an effective green solution contributing to the current energy demand in Rwanda but a huge amount of sediment contained in water of Sebeya River on which this plant is built results in loss of the plant capacity. The aim of this study was to conduct the performance evaluation of Keya HPP sediment basin located in Rubavu district, western province of Rwanda. Specifically, laboratory tests of sediment, efficiency of the basin, assessment of sedimentation problems on HPP operations, proposition of technical options for increasing the removal efficiency of sediment basin and other options for reducing sediment at the source of generation were performed using different methods including interviews and questioning Keya hydropower technicians, field sediment sampling followed by hydrometer and Particle Size Distribution (PSD) analysis. Analysis was made in University of Rwanda (UR) Soil Mechanics laboratory. MICROSOFT EXCEL and Graphisoft Archicad 18 softwares with Massachusetts Institute of Technology (MIT) soil classification were used as data analysis tools. Results showed that the overall efficiency removal of the diversion headwork was 85%. However, after comparing sediment concentration at the inlet and outlet of the sediment basin, it was found that the basin removed only 22% of sediment from diverted water toward the turbine. This means that 78% of sediment escapes the basin to cause erosion on the turbine components resulting in reduction of the plant capacity from 2.2 MW to 900 KW. To ensure sustainable solution to sediment issues in Keya HPP, an upstream sediment trap reservoir is proposed. It is recommended also that Rwanda Energy Group (REG) should work together with Rwanda Natural Resource Authority (RNRA) at national level to ensure sustainable development of erosion control in the Sebeya catchment area.

Share and Cite:

Munyaneza, O. , Majoro, F. , Mutake, S. and Hagenimana, E. (2015) Performance Evaluation of Sediment Basins: Case Study of Keya Hydropower Plant in Rwanda. Journal of Water Resource and Protection, 7, 1387-1398. doi: 10.4236/jwarp.2015.716112.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.