Predispatch of Hydroelectric Power Systems with Modifications in Network Topologies

HTML  Download Download as PDF (Size: 2816KB)  PP. 2271-2283  
DOI: 10.4236/am.2014.515221    3,579 Downloads   4,275 Views  Citations

ABSTRACT

In this article, the primal-dual interior-point methods are used to minimize costs and losses in a predispatch model for the generation and transmission of direct current (DC) power flow in a hydroelectric system with pre-programmed manipulations; i.e., in cases of preventive maintenance, within a period of twenty-four hours. From the computational standpoint, the effort required to solve a problem with and without manipulations is similar, and the reasons why will be also discussed in this study. Computational results prove these findings.

Share and Cite:

Carvalho, S. and Oliveira, A. (2014) Predispatch of Hydroelectric Power Systems with Modifications in Network Topologies. Applied Mathematics, 5, 2271-2283. doi: 10.4236/am.2014.515221.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.