A Bivariate Software Reliability Model with Change-Point and Its Applications

HTML  Download Download as PDF (Size: 432KB)  PP. 1-7  
DOI: 10.4236/ajor.2011.11001    6,890 Downloads   13,124 Views  Citations

Affiliation(s)

.

ABSTRACT

Testing-time when a change of a stochastic characteristic of the software failure-occurrence time or software failure-occurrence time-interval is observed is called change-point. It is said that effect of the change-point on the software reliability growth process influences on accuracy for software reliability assessment based on a software reliability growth model (SRGM). We propose an SRGM with the effect of the change-point based on a bivariate SRGM, in which the software reliability growth process is assumed to depend on the testing-time and testing-effort factors simultaneously, for accurate software reliability assessment. And we discuss an optimal software release problem for deriving optimal testing-effort expenditures based on our model. Further, we show numerical examples of software reliability assessment based on our bivariate SRGM and estimation of optimal testing-effort expenditures by using actual data.

Share and Cite:

S. Inoue and S. Yamada, "A Bivariate Software Reliability Model with Change-Point and Its Applications," American Journal of Operations Research, Vol. 1 No. 1, 2011, pp. 1-7. doi: 10.4236/ajor.2011.11001.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.