The Metro Project Construction Safety Risk Managing System of GMC

HTML  XML Download Download as PDF (Size: 469KB)  PP. 36-41  
DOI: 10.4236/ojsst.2014.41005    8,373 Downloads   11,850 Views  Citations

ABSTRACT

Based on the international vulgate safety risk managing theory, the Guangzhou Metro Corporation (GMC) summarizes the standard system of safety risk management in metro rail transit project, integrating with criterion files about project on safety risk management promulgated by the Ministry of Housing and Urban-Rural Development of the People’s Republic of China (MOHURD), according to the project practice. The result of application indicated that this system, which has been popularized in several other Chinese cities, effectively guaranteed personnel and project safety, and promoted the safety risk managing level of project participators in the same time.

Share and Cite:

Liu, G. , Luo, F. and Zeng, G. (2014) The Metro Project Construction Safety Risk Managing System of GMC. Open Journal of Safety Science and Technology, 4, 36-41. doi: 10.4236/ojsst.2014.41005.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.