Weighted Multi-Skill Resources Project Scheduling

HTML  Download Download as PDF (Size: 67KB)  PP. 1125-1130  
DOI: 10.4236/jsea.2010.312131    5,769 Downloads   10,844 Views  Citations

Affiliation(s)

.

ABSTRACT

In this paper, we present an extension of the classical Resource Constrained Project Scheduling Problem (RCPSP). We present a new type of resource constraints in which staff members are involved. We present a new model where staff members can have several skills with different proficiency, i.e., a staff member is able to perform more than one kind of activity as well as the time need is complete the task assign depends on the staff individual skill. We call this model the Weighted-Multi-Skill Project Scheduling Problem (WMSPSP). In our model, an activity has specific skill requirements that must be satisfied. To solve this problem, we propose a lower bound that uses a linear programming scheme for the RCPSP.

Share and Cite:

F. Al-Anzi, K. Al-Zame and A. Allahverdi, "Weighted Multi-Skill Resources Project Scheduling," Journal of Software Engineering and Applications, Vol. 3 No. 12, 2010, pp. 1125-1130. doi: 10.4236/jsea.2010.312131.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.