Tsao, C., Alves, T., and Mitropoulos, P. (2012) “Different Perspectives on Teaching Lean Construction” 2012 Conference of the International Group for Lean Construction, July 18-20, San Diego, CA.
-
Memarian, B. and Mitropoulos, P. (2012) “Managing Projects for Speed and Safety: Work Practices of a High Performance Concrete Supervisor” 2012 Conference of the International Group for Lean Construction, July 18-20, San Diego, CA.
-
Mitropoulos, P. (2012) “Interaction of Production Control and Safety Management System and Implications for Safety" 2012 Conference of the International Group for Lean Construction, July 18-20, San Diego, CA.
-
Memarian, B. and Mitropoulos, P. (2012) “Organizing Production for Speed and Safety: Lessons from a multi-story concrete building.” In Thurairajah N. (Ed), Conference Proceedings of the CIB International Management of Construction Research to Practice (MCRP) Conference, CIB, ISBN 978-2-9813355-1-7, June 26-30, Montreal, pp 894-905.
-
Memarian, B. and Mitropoulos, P. (2012) "Safety Incidents and High Risk Activities in Masonry Work" In Cai, H., Kandil, A., Hastak, M., and Dunston P. (Eds) Construction Challenges in a flat world, Proceedings of the Construction Research Congress, ASCE, May 21-23, Purdue, IN, pp: 2510-2519.
-
Mitropoulos, P. and Memarian B. (2012) “A Framework of Teamwork Attributes Affecting Workers Safety” In Cai, H., Kandil, A., Hastak, M., and Dunston P. (Eds) Construction Challenges in a flat world, Proceedings of the Construction Research Congress, ASCE, May 21-23, Purdue, IN. pp:1400-1408.
-
Mitropoulos, P. and Memarian B. (in press) "Task Demands in Masonry Work: Sources, Performance Implications and Management Strategies" Accepted for publication, J. of Constr. Engrg. & Mgt, ASCE, July 2012.
-
Mitropoulos, P. and Namboodiri, M. (2011). “A New Method for Measuring the Safety Risk of Construction Activities: The Task Demands Assessment.” J. of Constr. Engrg. & Mgt., 137(1): 30-38.
-
Mitropoulos, P., and Guillama, V. (2011). “A Framework of Task Demand Factors for Residential Framing Activities” Management Procurement and Law Journal, ICE, Feb 2011 themed issue on Construction Health and Safety: New Directions, 164(1): 19-27.
-
Mitropoulos, P. and Namboodiri, M. (2011). “The Task Demands Assessment Methodology.” Management Procurement and Law Journal, ICE, Feb 2011 themed issue on Construction Health and Safety: New Directions, 164(1): 9-17.
-
Abdelhamid, T.S., Mitropoulos, P., Schafer, D. and Howell, G.A. (2010) “Construction Safety: A Lean Construction Research Agenda” The American Professional Constructor, AIC, Vol 33(3):31-67.
-
Mitropoulos, P., and Nichita T. (2010) “Critical Aspects of Production Control on Projects with Labor Constraints: Lessons from a Residential Case Study.” J Mgt in Engrg, ASCE, Vol. 26, No. 3, pp. 153-159.
-
Mitropoulos, P. and Guillama, V. (2010). “Analysis of Residential Framing Accidents, Activities, and Task Demands,” J. of Constr. Engrg. & Mgt., ASCE, Vol. 136, No.2, 260-269.
-
Abdelhamid T. S., Mohamed El-Gafy, and Mitropoulos P. (2009). “Selection of Roof Casting Formwork Systems for the Bird Island Project: A Case Study.” Practice Periodical on Structural Design and Construction, Vol. 14, No. 4, pp 224-241.
-
Mitropoulos, P., and Cupido, G., (2009). “The Role of Production & Teamwork Practices in Construction Safety: A Cognitive Model and an Empirical Case Study.” Journal of Safety Research, 40(4): 265-275.
-
Mitropoulos, P. (2009) “Process Metrics for Proactive Process Control.” The American Professional Constructor Journal, American Institute of Constructors, 33(1): 33-40.
-
Mitropoulos P., Cupido G, and Namboodiri M. (2009). “A Cognitive Approach to Construction Safety: The Task Demand-Capability Model,” J. of Constr. Engrg. & Mgt., ASCE, 135(9): 881-889.
-
Mitropoulos, P., and Cupido, G., (2009). “Safety as an Emergent Property: An Investigation into the Work Practices of High Reliability Framing Crews,” J. of Constr. Engrg. & Mgt., 135 (5), 407-415.
-
Mitropoulos, P., Nichita T., Abdelhamid, T. (2008). “Sources of Workflow Uncertainty and Variation in Residential Construction.” The Housing and Building Research Center (HBRC) Journal, 4(1): 132-142.
-
Mitropoulos, P. (2007) “Beyond Compliance: New Strategies for Construction Accident Prevention.” Construction Information Quarterly, 9(2): 69-73.
-
Mitropoulos P., Abdelhamid T. S, and. Howell G. A. (2005). “Systems Model of Construction Accident Causation.” J. of Constr. Engrg. & Mgt., ASCE, 131(7): 816-825.
-
Mitropoulos P. and Howell G. A. (2002) “Renovation Projects: Design Process Problems and Improvement Mechanisms,” J. of Constr. Engrg. & Mgt., ASCE, 128(4): 179-185.
-
Mitropoulos P. and Howell G. A. (2001). “Model for Understanding, Preventing, and Resolving Project Disputes” J. of Constr. Engrg. & Mgt., ASCE, 127(3): 223-231
-
Mitropoulos P. and Tatum C.B. (2000). “Forces Driving Adoption Of New Information Technologies,” J. of Constr. Engrg. & Mgt., ASCE, 126(5): 340-348.
-
Mitropoulos P. and Tatum C.B. (2000). “Management-Driven Integration,” J. of Mgt in Engrg, ASCE, 16(1): 48-58.
-
Mitropoulos P. and Tatum C.B. (1999). “Technology Adoption Decisions in Construction Organizations.” J. of Constr. Engrg. & Mgt., ASCE, 125(5): 330-338.
-
DeLaGarza J., Mitropoulos P. (1992). “Flavors and Mixins of Expert System Technology Transfer”, J. of Constr. Engrg. & Mgt., 118(3): 435-453.
-
DeLaGarza J., and Mitropoulos P. (1992). “Technology Transfer of expert Systems at Stone & Webster Engineering Corporation: A Case Study.” Building Research and Information, 20(4): 236-241.
-
DeLaGarza J., Mitropoulos P. (1991). “Technology Transfer Model for Expert Systems”, J. of Constr. Engrg. & Mgt., 117(4): 736-755.