Kyuman Cho
Department of Architectural Engineering, School of Architecture
Chosun University, South Korea
Assistant Professor
Email: cho129@chosun.ac.kr
Qualifications
2009 Ph.D., Construction Engineering and Management, University of Seoul
2005 M.S., Construction Engineering and Management, University of Seoul
2003 B.S., Architectural Engineering, University of Seoul
Publications (selected)
-
Wright, E., Cho, K., and Hastak, M. 2014. Assessment of the US nuclear construction industry in terms of human capital and construction technologies. J. of Mgmt. in Eng., ASCE, (Accepted)
-
Wright, E., Cho, K., and Hastak, M. 2014. Assessment of critical construction engineering and management aspects of nuclear power projects. J. of Mgmt. in Eng., ASCE, 10.1061/(ASCE)ME.1943-5479.0000286. ISSN 1943-5479. Available from: http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000286
-
Cho, K., Hong, Y., and Seo, J. 2014. Assessment of the Economic Performance of Vacuum Insulation Panels for Housing Projects. Energy and Buildings, Elsevier, vol. 70, pp. 45-51,
ISSN 0378-7788. Available from: http://www.sciencedirect.com/science/article/pii/S0378778813007901
-
Cho, K. 2014. Evaluation on Technologies Ensuring Green Performance on Multi-family housing projects, J. of Asian Architecture and Building Engineering, vol. 17, no. 1, pp. 133-139. ISSN 1346-7581. Available from: https://www.jstage.jst.go.jp/article/jaabe/13/1/13_133/_article
-
Cho, K., Hong, T., and Hyun, C. 2013. Space Zoning concept-based Scheduling Model for Repetitive Construction Process, J. of Civil Engineering and Management, Taylor & Francis, vol. 19, no. 3, pp. 409-421. ISSN 1392-3730. Available from: http://www.tandfonline.com/doi/abs/10.3846/13923730.2012.757561
-
Cho, K. and Hastak, M. 2013. Time and cost optimized decision support model for fast track projects, J. of Const. Eng. & Mgmt., ASCE, vol. 139, no. 1, pp. 90-101. ISSN 1943-7862. Available from: http://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0000570
-
Han, Y., Cho, K., Hong, T., and Hyun, C. 2012. Percentage of workable days in scheduling superstructure work for building construction projects in Korea, KSCE J. of Civil Engineering, vol. 16, no. 4, pp. 517-525. ISSN 1226-7988. Available from: http://link.springer.com/article/10.1007/s12205-012-1419-6#
-
Jin, R., Cho, K., Hyun, C., and Son, M. 2012. MRA-based Revised CBR Model for Cost Prediction in the Early Stage of Construction Projects, Expert System with Applications, Elsevier, vol. 39, no. 5, pp. 5214-5222. ISSN 0957-4174. Available from: http://www.sciencedirect.com/science/article/pii/S095741741101548X
-
Hong, T., Cho, K., Hyun, C., and Han, S. 2011. Simulation based schedule control model for core wall construction of high-rise building, J. of Const. Eng. & Mgmt., ASCE, vol. 137, no. 6, pp. 393-402. ISSN 1943-7862. Available from: http://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0000300
-
Moon, H., Cho, K., Hyun, C., and Hong, T. 2011. Selection model of delivery methods for multi-family housing construction projects, J. of Mgmt. in Eng., ASCE, vol. 27, no. 2, pp. 106-115. ISSN 0742-597X. Available from: http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000038?journalCode=jmenea
-
Cho, K., Hong, T., and Hyun, C. 2011. Scheduling model for repetitive construction process of high-rise buildings, Can. J. of Civ. Eng., vol. 38, no. 1, pp. 36-48. ISSN 0315-1488. Available from: http://www.nrcresearchpress.com/doi/abs/10.1139/l10-108
-
Cho, K., Hong, T., and Hyun, C. 2010. Integrated schedule and cost model for repetitive construction process, J. of Mgmt. in Eng., ASCE, vol. 26, no. 2, pp. 78-88. ISSN 0742-597X. Available from: http://ascelibrary.org/doi/abs/10.1061/(ASCE)ME.1943-5479.0000009
-
Cho, K., Hyun, C., Koo, K., and Hong, T. 2010. Partnering process model for public sector fast-track design build projects, J. of Mgmt. in Eng., ASCE, vol. 26, no. 1, pp. 19-29. ISSN 0742-597X. Available from: http://ascelibrary.org/doi/abs/10.1061/(ASCE)0742-597X(2010)26:1(19)
-
Cho, K., Hong, T., and Hyun, C. 2009. Effect of project characteristics on project performance in construction projects based on Structural Equation Model, Expert System with Applications, Elsevier, vol. 36, no. 7, pp. 10461-10470. ISSN 0957-4174. Available from: http://www.sciencedirect.com/science/article/pii/S0957417409000736
-
Hyun, C., Cho, K., Koo, K., Hong, T., and Moon, H. 2008. Effect of delivery methods on design performance in multi-family housing projects, J. of Const. Eng. & Mgmt., ASCE, vol. 134, no. 7, pp. 468-482. ISSN 1943-7862. Available from: http://ascelibrary.org/doi/abs/10.1061/(ASCE)0733-9364(2008)134:7(468)
Profile Details
https://www.researchgate.net/profile/Kyuman_Cho
http://scholar.google.co.kr/citations?user=6TbC5eMAAAAJ&hl=ko&oi=sra