Biography

Kyuman Cho

Department of Architectural Engineering, School of Architecture

Chosun University, South Korea

Assistant Professor


Email: cho129@chosun.ac.kr


Qualifications

2009 Ph.D., Construction Engineering and Management, University of Seoul

2005 M.S., Construction Engineering and Management, University of Seoul

2003 B.S., Architectural Engineering, University of Seoul


Publications (selected)

  1. Wright, E., Cho, K., and Hastak, M. 2014. Assessment of the US nuclear construction industry in terms of human capital and construction technologies. J. of Mgmt. in Eng., ASCE, (Accepted)
  2. Wright, E., Cho, K., and Hastak, M. 2014. Assessment of critical construction engineering and management aspects of nuclear power projects. J. of Mgmt. in Eng., ASCE, 10.1061/(ASCE)ME.1943-5479.0000286. ISSN 1943-5479. Available from: http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000286
  3. Cho, K., Hong, Y., and Seo, J. 2014. Assessment of the Economic Performance of Vacuum Insulation Panels for Housing Projects. Energy and Buildings, Elsevier, vol. 70, pp. 45-51,
    ISSN 0378-7788. Available from: http://www.sciencedirect.com/science/article/pii/S0378778813007901
  4. Cho, K. 2014. Evaluation on Technologies Ensuring Green Performance on Multi-family housing projects, J. of Asian Architecture and Building Engineering, vol. 17, no. 1, pp. 133-139. ISSN 1346-7581. Available from: https://www.jstage.jst.go.jp/article/jaabe/13/1/13_133/_article
  5. Cho, K., Hong, T., and Hyun, C. 2013. Space Zoning concept-based Scheduling Model for Repetitive Construction Process, J. of Civil Engineering and Management, Taylor & Francis, vol. 19, no. 3, pp. 409-421. ISSN 1392-3730. Available from: http://www.tandfonline.com/doi/abs/10.3846/13923730.2012.757561
  6. Cho, K. and Hastak, M. 2013. Time and cost optimized decision support model for fast track projects, J. of Const. Eng. & Mgmt., ASCE, vol. 139, no. 1, pp. 90-101. ISSN 1943-7862. Available from: http://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0000570
  7. Han, Y., Cho, K., Hong, T., and Hyun, C. 2012. Percentage of workable days in scheduling superstructure work for building construction projects in Korea, KSCE J. of Civil Engineering, vol. 16, no. 4, pp. 517-525. ISSN 1226-7988. Available from: http://link.springer.com/article/10.1007/s12205-012-1419-6#
  8. Jin, R., Cho, K., Hyun, C., and Son, M. 2012. MRA-based Revised CBR Model for Cost Prediction in the Early Stage of Construction Projects, Expert System with Applications, Elsevier, vol. 39, no. 5, pp. 5214-5222. ISSN 0957-4174. Available from: http://www.sciencedirect.com/science/article/pii/S095741741101548X
  9. Hong, T., Cho, K., Hyun, C., and Han, S. 2011. Simulation based schedule control model for core wall construction of high-rise building, J. of Const. Eng. & Mgmt., ASCE, vol. 137, no. 6, pp. 393-402. ISSN 1943-7862. Available from: http://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0000300
  10. Moon, H., Cho, K., Hyun, C., and Hong, T. 2011. Selection model of delivery methods for multi-family housing construction projects, J. of Mgmt. in Eng., ASCE, vol. 27, no. 2, pp. 106-115. ISSN 0742-597X. Available from: http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000038?journalCode=jmenea
  11. Cho, K., Hong, T., and Hyun, C. 2011. Scheduling model for repetitive construction process of high-rise buildings, Can. J. of Civ. Eng., vol. 38, no. 1, pp. 36-48. ISSN 0315-1488. Available from: http://www.nrcresearchpress.com/doi/abs/10.1139/l10-108
  12. Cho, K., Hong, T., and Hyun, C. 2010. Integrated schedule and cost model for repetitive construction process, J. of Mgmt. in Eng., ASCE, vol. 26, no. 2, pp. 78-88. ISSN 0742-597X. Available from: http://ascelibrary.org/doi/abs/10.1061/(ASCE)ME.1943-5479.0000009
  13. Cho, K., Hyun, C., Koo, K., and Hong, T. 2010. Partnering process model for public sector fast-track design build projects, J. of Mgmt. in Eng., ASCE, vol. 26, no. 1, pp. 19-29. ISSN 0742-597X. Available from: http://ascelibrary.org/doi/abs/10.1061/(ASCE)0742-597X(2010)26:1(19)
  14. Cho, K., Hong, T., and Hyun, C. 2009. Effect of project characteristics on project performance in construction projects based on Structural Equation Model, Expert System with Applications, Elsevier, vol. 36, no. 7, pp. 10461-10470. ISSN 0957-4174. Available from: http://www.sciencedirect.com/science/article/pii/S0957417409000736
  15. Hyun, C., Cho, K., Koo, K., Hong, T., and Moon, H. 2008. Effect of delivery methods on design performance in multi-family housing projects, J. of Const. Eng. & Mgmt., ASCE, vol. 134, no. 7, pp. 468-482. ISSN 1943-7862. Available from: http://ascelibrary.org/doi/abs/10.1061/(ASCE)0733-9364(2008)134:7(468)


Profile Details

https://www.researchgate.net/profile/Kyuman_Cho

http://scholar.google.co.kr/citations?user=6TbC5eMAAAAJ&hl=ko&oi=sra

Free SCIRP Newsletters
Copyright © 2006-2024 Scientific Research Publishing Inc. All Rights Reserved.
Top