Biography

Llewellyn Tang

Head, Department of Architecture and Built Environment

University of Nottingham, China

Associate Professor


Email: Llewellyn.Tang@nottingham.edu.cn


Qualifications

Ph.D., City University of Hong Kong, Construction Engineering & Management

B.Sc., City University of Hong Kong, Construction Engineering & Management


Publications(selected)

  1. Dwyer, T., Kimpian, J., Arto, K. and Tang, L.C.M. (2013) BIM and Intelligent Buildings, Intelligent Buildings Second edition, Edited by Derek Clements-Croome (In press).
  2. Tang L.C.M. andOh, J.M. (2013) A study of effective knowledge sharing practices in an international quantity-surveying firm. International Journal of Information Management. (Accepted for publication).
  3. Tang, L.C.M. and Jadego, S. (2013) Knowledge management in construction: are we lagging behind other industries? International Journal of Information Management. (Accepted for publication).
  4. Tang, L.C.M. and Philips, J. (2013) The development of Cross Project knowledge sharing Risk (CPR) management tool in a main UK contractor. International Journal of Information Management. (Accepted for publication).
  5. Darlington, M.J., Zhao, Yuyang, Tang, L.C.M., Austin, S.A. and Culley S.J. (2013) Measuring Information Value: key information properties and approaches to assessment, Information Procession and Management. (Accepted for publication).
  6. Xu, S and Tang, L.C.M. (2013) Development of an Entropy and AHP-based (e-AHP) Chinese contractor selection model, Construction Management and Economics. (Accepted for publication).
  7. Long, N.D., Phan, D.H., Tang, L.C.M. (2013) Simulating construction duration for multi-story buildings with controlling activities. ASCE Journal of Construction Engineering and Management. (Accepted for publication).
  8. Kim, Seungho, Kim, Sangyong and Tang, L.C.M. Kim, Gwang-Hee (2012) Efficient management of construction process using RFID-PMIS System, Applied Mathematics and Information Sciences, 7 (1). 19-26.
  9. Raisbeck, P. and Tang, L.C.M. (2012) Identifying design development factors in Australian PPP Projects using an AHP framework, Construction Management and Economics, 31 (1). 20-39.
  10. Kim, Jungseop, Kim, Sangyong and Tang, L.C.M. (2012) Feasibility of support vector machine for the determination of building materials, ASCE Journal of Computing in Civil Engineering. (In press).
  11. Zhao Yuyang and Tang L.C.M. (2011) Challenges of product-service shift and life cycle management in aerospace industry, in: Aerospace: Industries, Engineering and Management, Nova Publishers, U.S. (Accepted for publication).
  12. Tang, L.C.M., Leung, A.Y.T. and Wong, C.W.Y. (2010) Entropic risk analysis by a high level decision support system (e-FDSS) for construction SMEs, ASCE Journal of Computing in Civil Engineering, 24 (1), 81-94.
  13. Tang, L.C.M., Zhao, Yuyang, Austin, S.A., Darlington, M.J. and Culley, S.J. (2010) Codification vs personalisation: A study of the information evaluation practice between aerospace and construction industries, International Journal of Information Management, 30 (4), 315-325.
  14. Tang, L.C.M. and Leung, A.Y.T (2009) An entropy-based financial decision support system (e-FDSS) for project analysis in construction SMEs, Construction Management and Economics, 27 (5), 499-513.
  15. Zhao, Yuyang, Tang, L.C.M., Darlington, M.J., Austin, S.A. and Culley, S.J. (2008) High value information in engineering organisations, International Journal of Information Management, 28 (4), 246-258.
  16. Darlington, M., Culley, S.J., Zhao, Y., Austin, S.A. and Tang, L.C.M. (2008) Defining a framework for the evaluation of information, Special Issue of the International Journal of Information Quality on "Information Quality and Usability, 2 (2), 115-132.
  17. Tang, C.M., Leung, A.Y.T. and Lam, K.C. (2006a) An entropy application to improve construction finance decisions, ASCE Journal of Construction Engineering and Management, 132 (10), 1099-1113.
  18. Tang, C.M., Wong, Christy W.Y. and Leung, A.Y.T. (2006b) Selection of funding schemes by a borrowing decision model: a Hong Kong case study, Construction Management and Economics, 24 (4), 349-365.
  19. Lam, K.C., Tang, C.M.  and Lee, W.C. (2005) Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects, Construction Management and Economics,23 (2), 127-75.
  20. Van, L.T., Charoenngam, C.C., Long, N.D. and Tang, C.M. (2004) Construction lost-time injuries in Vietnam: an exploratory study, Journal of Building and Construction Management, 9 (1), 85-90.
  21. Tang, C.M., Lee, S.W. and Long, N.D. (2004) A knowledge-based implementation of web and internet technology by construction design firms in Hong Kong, Journal of Building and Construction Management, 9 (1), 73-84.
  22. Lam, K.C., Cheung, S.O., Tang, C.M. and Ng, T.S. (2002) The capital budgeting evaluation practices of building contractors in Hong Kong, Australian Journal of Construction Economics and Building, 2 (1), 81-93.


Profile Details

http://www.nottingham.edu.cn/en/engineering/staffprofile/ir-dr-llewellyn-tang.aspx

Free SCIRP Newsletters
Copyright © 2006-2024 Scientific Research Publishing Inc. All Rights Reserved.
Top