[1]
|
L. R. Xie, Z. L. Yang, C. Zhang and J. F. Huan, “Security Evaluation of Maintenance Schedule Based on Load Supply Adequacy and Generation Loss,” Power System Automation Conference, 2010.
|
[2]
|
Z. Q. Ge, D. X. Wang and M. H. Ge, “Security Checking System for Daily Generation Scheduling of East China Power Grid and Its Expansion,” Automation of Electric Power Systems, Vol. 32, No. 10, 2008, pp. 45-48.
|
[3]
|
Z. X. Chen, K. Xie and J. Zhang, “Optimal Model and Algorithm for Day-ahead Generation Scheduling of Transmission Grid Security Constrained Convention Dispatch,” Automation of Electric Power Systems, 2009, Vol. 33, No. 1, pp. 10-13.
|
[4]
|
J. Geng Jian, F. Xu Fan and J. G. YAO, “Performance Analysis of Mixed-integer Programming Based Algorithm for Security Constrained Unit Commitment,” Automation of Electric Power Systems, Vol. 33, No. 21, 2009, pp. 24-27.
|
[5]
|
N. Zhang, H. K. Chen, X. M. Luo, et al., “Model and Algorithm of Energy-conservation Based Generation Dispatching for Guangdong Power Grid,” Power system Technology, Vol. 32, No. 24, 2008, pp. 11-15.
|
[6]
|
X. L. Li, J. Y. Zhou and Y. Erkeng, “Linear Mixed Integer Programming Algorithm for Unit Commitment Based on Dynamic Search,” Automation of Electric Power Systems, Vol. 32, No. 21, 2008, pp. 18-21.
|
[7]
|
G. W. Chang, M. Aganagic, J. G. Waight, J. Medina, T. Burton, S. Reeves and M. Christoforidis, “Experiences with Mixed Integer Linear Programming Based Approaches on Short-term Hydro Scheduling,” IEEE Transactions Power Syst, Vol. 16, No. 4, 2001, pp. 743-749.
|
[8]
|
Z. L. Yang, G. Q. Tang and L. L. Li, “Application of Relaxed Constraints Model on Generation Schedule Optimization,” Automation of Electric Power Systems, Vol. 34, No. 14, 2010, pp. 53-57.
|