[1]
|
S. Koizumi, M. Okumura, and T. Yanase, “Application and development of distribution automation system in TEPCO,” Proceedings of IEEE Power Engineering Society General meeting, Vol. 3, pp. 2429-2435, 2005.
|
[2]
|
R. D. Dunlop, R. Gutman and P. P. Marchenko, “Analytical development of loadability characteristics for EHV and UHV transmission line,” IEEE Transactions on Power Apparatus and System, 98, pp. 606-613, 1979.
|
[3]
|
H. D. Chiang, A. J. Flueck, K. S. Shah, and N. Balu, “CPFLOW: A practical tool for tracing power system steady-state stationary behavior due to load and generation variations,” IEEE Transactions on Power Systems, 10, pp. 623-634, 1995.
|
[4]
|
S. Greene, I. Dobson and F. L. Alvarado, “Sensitivity of transfer capability margins with a fast formula,” IEEE Transactions on Power Systems, 17, pp. 34-40, 2002.
|
[5]
|
Energy and Electric [1993] No. 228. (1999), “The planning and designing rule of urban power network,” 1st edition, China Electric Power Press, Beijing.
|
[6]
|
X. Li, P. Li, X. Zhu, G. Peng, and Y. Ou, “Evaluation construction size of district high voltage distribution networks,” Automation of electric power systems, 31, pp. 46-50, 2007.
|
[7]
|
R. E. Brown, A. P. Hanson, H. L. Willis, F. A. Luedtke, M. F. Born, and N. C. Raleigh, “Assessing the reliability of distribution systems,” IEEE Computer Applications in Power, 14, pp. 44-49, 2001.
|
[8]
|
J. Zhang, D. Luo, J. Yao, and W. Li, “Research on value of capacity-load ratio in urban power network planning based on the economical analysis,” Relay, 35, pp. 39-43, 2007.
|
[9]
|
S. Curcic, C. S. Ozveren, and K. L. Lo, “Computer-based strategy for the restoration problem in electric power distribution systems,” IEEE Proceedings-Generation, Transmission and Distribution, 144, pp. 389-398, 1997.
|
[10]
|
O. Yan and C. Singh, “Assessment of available transfer capability and margins,” IEEE Transactions on Power Systems, 17, pp. 463-468, 2002.
|
[11]
|
M. H. Gravener, and C. Nwankpa, “Available transfer capability and first order sensitivity,” IEEE Transactions on Power Systems, 14, pp. 512-518, 1999.
|