Procurement Method Selection for Building Maintenance Projects: The Case of Malaysian Public Universities ()
Abstract
The purpose of this paper is to implement
and validate a decision making framework for building maintenance projects. The
growing importance of maintenance sector not only in Malaysia but al- so
increasingly globalized, the difficulty in selecting an appropriate procurement
method and lack of research in this area provide an impetus for this research.
There were 19 procurement selection criteria identified. In addition, there
were 4 types of procurements methods which include outsourcing by specialist
term contract, outsourcing by tendered schedule term contract, out- sourcing by
repair and maintenance contract and outsourcing by measured term contract
identified to be the most popular procurement methods adapted by public
universities currently and at the same time were considered most important. The
decision making framework was developed based on AHP technique and principles.
Expert Choice Software was employed as development tool where the criteria and
alternatives were integrated into the framework. Finally, structured interview
was conducted to validate the framework developed. The validation process was
carried out through structured interview with selected public university.
Share and Cite:
Chua, S. , Ali, A. and Alias, A. (2014) Procurement Method Selection for Building Maintenance Projects: The Case of Malaysian Public Universities.
World Journal of Engineering and Technology,
2, 7-13. doi:
10.4236/wjet.2014.23B002.
Conflicts of Interest
The authors declare no conflicts of interest.
References
[1]
|
Ng, S.T., Luu, D.T. and Chen, S.E. (2002) Decision Criteria and Their Subjectivity in Construction Procurement Selection. The Australian Journal of Construction Economics and Building, 2, 70-80.
|
[2]
|
Hui, E.Y.Y. and Tsang, A.H.C. (2004) Sourcing Strategies of Facilities Management. Journal of Quality in Maintenance Engineering, 10, 85-92. http://dx.doi.org/10.1108/13552510410539169
|
[3]
|
Hashim, M., Li, M.C.Y., Yin, N.C., et al. (2006) Factors Influencing the Selection of Procurement Systems by Clients. International Conference on Construction Industry, 2006, Padang, 1-10.
|
[4]
|
Alhazmi, T. and McCaffer, R. (2000) Project Procurement System Selection Model. Journal of Construction Engineering and Management, 126, 176-184. http://dx.doi.org/10.1061/(ASCE)0733-9364(2000)126:3(176)
|
[5]
|
Masterman, J.W.E. (1996) Building Procurement Systems: An Introduction. Spon Press, London.
|
[6]
|
Ibbs, W. and Chih, Y.-Y. (2011) Alternative Methods for Choosing an Appropriate Project Delivery System (PDS). Facilities, 29, 527-541. http://dx.doi.org/10.1108/02632771111178418
|
[7]
|
Ratnasabapathy, S. and Rameezdeen, R. (2007) A Decision Support System for the Selection of Best Procurement System in Construction. Built-Environment Sri Lanka, 7, 53-43.
|
[8]
|
Masterman, J.W.E. (1992) An Introduction to Building Procurement Systems. Spon Press, London.
|
[9]
|
Cheung, S.O., Lam, T.I., Leung, M.Y., et al. (2001) An Analytical Hierarchy Process Based Procurement Selection Method. Construction Management and Economics, 19, 427-437. http://dx.doi.org/10.1080/014461901300132401
|