[1]
|
H. Y. Chen, J. F. Chen and X. Z. Duan, “Fuzzy Modeling and Optimization Algorithm on Dynamic Economic Dispatch in Wind Power Integrated System,” Automation of Electric Power Systems, Vol. 30, No. 2, 2010, pp. 22-26.
|
[2]
|
M. L. Wang, B. M. Zhang and Q. Xia, “A Novel Economic Dispatching Algorithm with Unit Ramp Rate and Network Security Constraints,” Automation of Electric Power Systems, Vol. 24, No.10, 2000, pp. 32-37.
|
[3]
|
Y. Z. Sun, J. Wu, G. J. Li and J. He, “Dynamic Economic Dispatch Considering Wind Power Penetration Based on Wind Speed Forecasting and Stochastic Programming,” Proceedings of the CSEE, Vol. 29, No. 4, 2009, pp. 23-32.
|
[4]
|
T. Senjyu, “A Fast Technique for Unit Commitment Problem by Extended Priority List,” IEEE Transactions on Power Systems, Vol. 18, No. 2, 2003, pp. 882-888. doi:10.1109/TPWRS.2003.811000
|
[5]
|
F. N. Lee, “The Application of Commitment Utilization Factor (UFC) to the Thermal Unit Commitment,” IEEE Transactions on Power Systems, Vol. 6, 1991, pp. 691-698. doi:10.1109/59.76714
|
[6]
|
L. Y. Sun, Y. Zhang and C. W. Jiang, “A Solution to the Unit Commitment Problem Based on Matrix Real-coded Genetic Algorithm,” Proceedings of the CSEE, Vol. 26, No. 2, pp. 82-87, Feb. 2006.
|
[7]
|
S. Chusanapiputt, D. Nualhong and S. Jantarang, “Unit Commitment by Selective Self-adaptive ACO with Relativity Pheromone Updating Approach,” Power Energy Conference, Vol. 13, No. 24, 2007, pp. 36-71.
|
[8]
|
K. Han, J. Zhao and J. X. Qian, “A Closed-loop Particle Swarm Optimization Algorithm for Power System Unit Commitment,” Automation of Electric Power Systems, Vol. 33, No. 1, 2009, pp. 36-40.
|
[9]
|
Y. W. Jiang, C. Chen and B. Y. Wen, “Particle Swarm Research of Stochastic Simulation for Unit Commitment in Wind Farms Integrated Power System,” Transactions Of China Electro Technical Society, Vol. 24, No. 6, 2009, pp. 129-137.
|
[10]
|
R. Q. Li and Z. Qin, “The Optimization Operation of Unit Commitment by Considering System Reliability,” Modern Electric Power, Vol. 29, No. 2, 2012, pp. 44-49.
|
[11]
|
Yang Xiuyuan, Xiao Yang and Chen Shuyong, “Wind Speed and Generated Power Forecasting in wind Farm,” Proceedings of the CSEE, vol. 25, No.11, pp. 1-5, June 2005.
|
[12]
|
Chun-Lung Chen, “Optimal Wind-Thermal Generating Unit Commitment,” IEEE Transactions on energy Conversion, vol. 23, No. 1, Mar. 2008.doi:10.1109/TEC.2007.914188
|