[1]
|
S. P. Sethi and D. Groupe, “D’Etudes et de Recherche en Analyse des, Sequencing of Robot Moves and Multiple Parts in a Robotic Cell,” Groupe D’Etudes et de Recherche en Analyse des Decisions, Montreal, 1989.
|
[2]
|
S. P. Sethi, C. Sriskandarajah, G. Sorger, J. Blazewicz and W. Kubiak, “Sequencing of Parts and Robot Moves in a Robotic Cell,” International Journal of Flexible Manufacturing Systems, Vol. 4, 1992, pp. 331-358.
doi:10.1007/BF01324886
|
[3]
|
Y. Crama and V. D. Klundert, “Cyclic Scheduling in 3-Machine Robotic Flow Shops,” Journal of Scheduling, Vol. 2, 1999, pp. 35-54.
doi:10.1002/(SICI)1099-1425(199901/02)2:1<35::AID-JOS15>3.0.CO;2-J
|
[4]
|
N. Brauner and G. Finke, “On a Conjecture about Robotic Cells: New Simplified Proof for the Three Machine Case,” INFOR, Vol. 37, No. 1, 1999, pp. 20-36.
|
[5]
|
N. G. Hall, H. Kamoun and C. Sriskandarajah, “Scheduling in Robotic Cells: Complexity and Steady State Analysis,” European Journal of Operational Research, Vol. 109, 1998, pp. 43-65.
doi:10.1016/S0377-2217(96)00333-5
|
[6]
|
N. G. Hall, H. Kamoun and C. Sriskandarajah, “Scheduling in Robotic Cells: Classification, Two and Three Machine Cells,” Operations Research, Vol. 45, 1997, pp. 421-439. doi:10.1287/opre.45.3.421
|
[7]
|
I. N. Kamalabadi, S. Gholami and A. H. Mirzaei, “A New Solution for the Cyclic Multiple-Part Type Three-Machine Robotic Cell Problem Based on the Particle Swarm Meta-Heuristic,” Journal of Industrial and Systems Engineering, Vol. 1, No. 4, 2008, pp. 304-317.
|
[8]
|
I. N. Kamalabadi, “A New Formulation for Scheduling Problems Through Petri-nets,” In The Iranian Mathematical Conference, Iran, 1996.
|
[9]
|
I. N. Kamalabadi, N. G. Hall and H. Sriskandarajah, “Minimizing Cycle Time in a blocking Flowshop,” Operations Research, Vol. 48, 2000, pp. 177-180.
doi:10.1287/opre.48.1.177.12451
|
[10]
|
A. Agnetis, “Scheduling No-Wait Robotic Cells with Two and Three Machines,” European Journal of Operational Research, Vol. 123, 2000, pp. 303-314.
doi:10.1016/S0377-2217(99)00258-1
|
[11]
|
A. Agnetis and D. Pacciarelli, “Part Sequencing in Three-Machine No-Wait Robotic Cells,” Operations Research Letters, Vol. 27, 2000, pp. 185-192.
doi:10.1016/S0167-6377(00)00046-8
|
[12]
|
Y. Crama, V. Kats and V. D. Klundert, “Cyclic Scheduling in Robotic Flow Shops,” Annals of Operation Research: Mathematics of Industrial Systems, Vol. 96, 2000, pp. 97-124.
|
[13]
|
M. Dawande, H. N. Geismar, S. P. Sethi and C. Sriskandarajah, “Sequencing and Scheduling in Robotic Cells: Recent Developments,” Journal of Scheduling, Vol. 8, 2005, pp. 387-426. doi:10.1007/s10951-005-2861-9
|
[14]
|
I. G. Drobouchevitch, S. P. Sethi and C. Sriskandarajah, “Scheduling Dual Gripper Robotic Cell One Unit Cycles,” European Journal of Operational Research, Vol. 171, 2006, pp. 598-631. doi:10.1016/j.ejor.2004.09.019
|
[15]
|
V. Deineko and G. Steiner, “Robotic-Cell Scheduling: Special Polynomially Solvable Cases of the Traveling Salesman Problem on Permuted Monge Matrices,” Journal of Combinatorial Optimization, Vol. 9, No. 4, 2005, pp. 381-399. doi:10.1007/s10878-005-1778-8
|
[16]
|
M. S. Akturk, H. Gultekin and O. E. Karasan, “Robotic Cell Scheduling with Operational Flexibility,” Discrete Applied Mathematics, Vol. 145, 2000, pp. 334-348.
doi:10.1016/j.dam.2004.02.012
|
[17]
|
H. Gultekin, M. S. Akturk and O. E. Karasan, “Cyclic Scheduling of a 2-Machine Robotic Cell with Tooling Constraints,” European Journal of Operational Research, Vol. 174, 2006, pp. 777-796.
doi:10.1016/j.ejor.2005.03.021
|
[18]
|
H. Gultekin, M. S. Akturk and O. E. Karasan, “Scheduling in a Three-Machine Robotic Flexible Manufacturing Cell,” Computers & Operations Research, Vol. 34, 2007, pp. 2463-2477. doi:10.1016/j.cor.2005.09.015
|
[19]
|
C. Sriskandarajah, N. G. Hall, H. Kamoun and H. Wan, “Scheduling Large Robotic Cells without Buffers,” Annals of Operations Research, Vol. 76, 1998, pp. 287-321. doi:10.1023/A:1018952722784
|
[20]
|
T. P. Bagchi, J. N. D. Gupta and C. Sriskandarajah, “A Review of TSP Based Approaches for Flow shop Scheduling,” European Journal of Operational Research, Vol. 169, 2006, pp. 816-854. doi:10.1016/j.ejor.2004.06.040
|
[21]
|
Y. Crama, “Combinatorial Optimization Models for Production Scheduling in Automated Manufacturing Systems,” European Journal of Operational Research, Vol. 99, 1997, pp. 136-153.
doi:10.1016/S0377-2217(96)00388-8
|
[22]
|
J. Maggot, “Performance Evaluation of Concurrent Systems Using Petri Nets,” Information Processing Letters, Vol. 8, No. 1, 1984, pp. 7-13.
doi:10.1016/0020-0190(84)90067-X
|