Chung, K.J. and Huang, T.S. (2006) The Optimal Cycle Time for Deteriorating Items with Limited Storage Capacity under Permissible Delay in Payments. Asia-Pacific Journal of Operational Research, 23, 347-370. https://doi.org/10.1142/S0217595906000814
has been cited by the following article:
Related Articles: