"Comparison of Risk Assessment for a Nuclear Power Plant Construction Project Based on Analytic Hierarchy Process and Fuzzy Analytic Hierarchy Process"
written by Dae-Woong Shin, Yoonseok Shin, Gwang-Hee Kim,
published by Journal of Building Construction and Planning Research, Vol.4 No.3, 2016
has been cited by the following article(s):
  • Google Scholar
  • CrossRef
[1] A hybrid multi-criteria decision-making approach for analyzing operational hazards in Heavy Fuel Oil-based power plants
Decision Analytics Journal, 2022
[2] Risk Assessment of Bridge Construction Safety Considering Multi-Information Fusion
ASCE-ASME Journal of …, 2022
[3] ارزیابی ریسک بهداشتی و محیط زیستی تصفیه خانه فاضلاب غرب اهواز با استفاده از روش های AHP و TOPSIS‎
فصلنامه علوم و تکنولوژی …, 2022
[4] Identification and prioritization of critical risk factors of commercial and recreational complex building projects: A Delphi study using the TOPSIS method
Applied Sciences, 2021
[5] An Integrated Management System for Quality, Health and Safety, and Environment: A Case Study
Journal of Electrical and Electronic Engineering, 2021
[6] Identifying and Categorizing Risks Incumbent in US Nuclear Power Plant Construction
2021
[7] FMEA-based methodology for delay analysis of construction projects
2020
[8] ОПРЕДЕЛЕНИЕ ЭФФЕКТИВНОСТИ ИНВЕСТИЦИОННЫХ ПРОЕКТОВ В ЖЕЛЕЗНОДОРОЖНОМ СТРОИТЕЛЬСТВЕ НА ОСНОВЕ ЦИФРОВЫХ ТЕХНОЛОГИЙ …
2020
[9] Research on Predictive Model of Prefabricated Building Safety Risk Based on RS-SVR
2020
[10] Assessing the Impact of Regulation on the Performance of Power and Pipeline Projects
2020
[11] Measuring the effectiveness of AHP and fuzzy AHP models in environmental risk assessment of a gas power plant
2020
[12] Comparison of Risk Assessment Methods within the Scope of Occupational Safety in the Construction Sector
2020
[13] Nuclear Power Plants with Artificial Intelligence in Industry 4.0 Era: Top-level Design and Current Applications—A Systemic Review
2020
[14] A novel approach for occupational health and safety and environment risk assessment for nuclear power plant construction project
2020
[15] Assessment of socio-economic efficiency of investments in transport construction by Monte Carlo method including uncertainty/Оценка социально-экономической …
2019
[16] Оценка социально-экономической эффективности инвестиций в транспортное строительство с учетом неопределенности методом Монте-Карло
2019
[17] Assessment of socio-economic efficiency of investments in transport construction by Monte Carlo method including uncertainty
2019
[18] Stakeholder perspectives on the cost requirements of Small Modular Reactors
2019
[19] FANPCE technique for risk assessment on subway station construction
2019
[20] An approach for risk prioritization in construction projects using analytic network process and decision making trial and evaluation laboratory
2019
[21] A hybrid MCDM technique for risk management in construction projects
Symmetry, 2018
[22] Prioritize and choose the best process of anaerobic digestion to produce energy from biomass using analytic hierarchy process (AHP)
Geology Ecology and Landscapes, 2017
[23] AHP-Based Comparative Analysis of Electricity Generating Portfolios for the Companies in EU and Ukraine: Criteria, Reliability, Safety.
2017
[24] A STUDY ON RISK MANAGEMENT PRACTICES IN CONSTRUCTION PROJECTS IN TAMIL NADU (COMPARATIVE