Biography

Prof. Yuan-Shyi Peter Chiu

Chaoyang University of Technology, Chinese Taipei


Email: ypchiu@cyut.edu.tw


Qualifications

Ph.D., Polytechnic University, USA

M.S., New Jersey Institute of Technology, USA

B.S., Chung Yuan Christian University, Chinese Taipei


Publications(Selected)

  1. Chiu, Yuan-Shyi Peter, Lin, H-D.(2013)An Innovative Blemish Detection System for Curved LED Lenses.Expert Systems with Applications, 40(2): 471-479.
  2. Chiu, Yuan-Shyi Peter, Lin, H-D., Cheng, F-T., Hwang, M-H. (2013) Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework.Journal of Scientific & Industrial Research,72(7): 435-440.
  3. Chiu, Yuan-Shyi Peter, Chen, K-K., Ting, C-K(2012)Replenishment run time problem with machine breakdown and failure in rework.Expert Systems with Applications, 39(1): 1291-1297.
  4. Chiu, Yuan-Shyi Peter, Lin, Y-C., Lin, L-W., Chiu, S.W. (2012)A single- producer multi-retailer integrated inventory model with a rework process.International Journal for Engineering Modelling, 25(1-4): 27-35.
  5. Chiu, Yuan-Shyi Peter, Liu, S-C., Chiu, C-L., Chang, H-H. (2011) Mathematical modelling for determining the replenishment policy for EMQ model with rework and multiple shipments.Mathematical and Computer Modelling54(9-10): 2165-2174.
  6. Chiu, Yuan-Shyi Peter, Lin, H-D.and Chang, H-H. (2011)Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown.Computers & Industrial Engineering, 60(4): 576-584.
  7. Chiu, Yuan-Shyi Peter, Lin, C-A.K., Chang, H-H.and Chiu, V.(2010)Mathematical modeling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance.Mathematical and Computer Modelling of Dynamical Systems, 16(4): 373-388.
  8. Chiu, Yuan-Shyi Peter, Chen, K-K., Cheng, F-T., Wu, M-F. (2010) Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown.Computers and Mathematics with Applications, 59(2): 919-932.
  9. Chiu, Yuan-Shyi Peter and Ting, C-K. (2010) A note on ‘Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns’.European Journal of Operational Research, 201(2): 641-643.
  10. Chiu, Yuan-Shyi Peter, Tseng, C-Y, Liu, W-C. & Ting, C-K. (2009) Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy.P I Mech E Part B: Journal of Engineering Manufacture, 223(2): 183-194.
  11. Chiu, Yuan-Shyi Peter, Lin, H-D. (2009) A hybrid approach based on Hotelling statistics for automated visual inspection of display blemishes in LCD panels.Expert Systems with Applications, 36(10): 12332-12339.
  12. Chiu, Yuan-Shyi Peter, Chiu, S.W., Li, C-Y., and Ting, C-K. (2009) Incorporating multi-delivery policy and quality assurance into economic production lot size problem.Journal of Scientific & Industrial Research, 68(6): 505-512.
  13. Chiu, Yuan-Shyi Peter, Chiu, S.W. & Chao, H-C. (2008) Effect of shortage level constraint on finite production rate model with rework.Journal of Scientific & Industrial Research, 67(2): 112-116.
  14. Chiu, Yuan-Shyi Peter, Chiu, S.W. and Chao, H-C. (2006) Numerical method for determination of reworking or scraping the defective items in a finite production rate model.Communications in Numerical Methods in Engineering, 22(5): 377-386.
  15. Chiu, Yuan-Shyi Peter (2006) The effect of service level constraint on EPQ model with random defective rate.Mathematical Problems in Engineering, 2006 (2006), Article ID 98502, 13 pages.
  16. Chiu, Yuan-Shyi Peter and Chiu, S.W. (2005) Incorporating expedited time and cost of the end product into the product structure diagram.International Journal of Machine Tools & Manufacture, 45(7-8): 987-991.
  17. Chiu, Yuan-Shyi Peter (2005) Combining a cost-benefit algorithm for ECTEP into the product structure diagram.International Journal of Materials and Product Technology, 22(4): 339-350.
  18. Chiu, Yuan-Shyi Peter (2003) Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging.Engineering Optimization, 35(4): 427-437.


Profile Details

Null

Free SCIRP Newsletters
Copyright © 2006-2024 Scientific Research Publishing Inc. All Rights Reserved.
Top