Biography

Prof. Eugene Levner

School of Economics

Ashkelon Academic College, Israel

Professor


Email: levner@hit.ac.il


Qualifications

1969 Ph.D., Computer andSystems Science, Central Economic-Mathematical Institute of the Academy of Sciences of the USSR, Russia

1963 M.Sc., Computational Mathematics, Moscow State University, Russia

1963 B.Sc., Computational Mathematics, Moscow State University, Russia


Publications (Selected)

  1. E. Levner, Y. Perlman, T.C.E. Cheng, I. Levner. (2011) A network approach to modelling the multi-echelon spare-part inventory system with backorders and interval-valued demand, International Journal Production Economics,v.132, pp. 43-51.
  2. V. Kats andE. Levner.(2011)A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times,European Journal ofOperational Research, 209, 1, 51-56.
  3. A. Che, V. Kats, E. Levner. (2011) Cyclic scheduling in robotic flowshops with bounded work-in-process levels, Naval Research Logistics 58(1), 1-16.
  4. V. Kats and E. Levner. ( 2011) Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions, Journal of Scheduling, 2011,14(3), 267-279.
  5. S. Sorek, W. von Igel, L. Kronaveter-Goldstein and E. Levner. (2010) Risk-dependent integrated water resources management: A conceptual model. Aqua Mundi. Journal of Water Sciences, 1(1), Am01006-1013.
  6. E. Levner, V. Kats, D. Alcaide andT.C.E. Cheng. (2010) Complexity of cyclic scheduling problems: A state-of-the-art survey, Computers and Industrial Engineering, 2010, 59 (2) 352-361.
  7. E. Levner: Book review ofJ. Blazewicz, K. Ecker, E. Pesch, G. Schmidt, J. Weglarz. (2009) Handbook on scheduling: from theory to applications. Journal of Scheduling, 12(4): 433-434.
  8. A. Che, E. Levner, V. Kats. (2009) A note on a quadratic algorithm for the 2-cyclic robotic scheduling problem Theoretical Computer Science, 410 (47-49), 5188-5190.
  9. V. Kats and E. Levner. (2009) A polynomial algorithm for 2-cyclic robotic scheduling, Discrete Applied Mathematics, 157(2), 339-355.
  10. E. Levner and J. Ganoulis. (2008) Sustainable management of water resources in transboundary river basins: risk assessment and modeling. Editorial. International Journal of Risk Assessment and Management, 10(4), 287-290.
  11. J. Ganoulis and E. Levner. (2008) Risk-based integrated management of transboundary water resources: A general framework, International Journal of Risk Assessment and Management, 10(4), 291-311.
  12. V. Kats and E. Levner. (2008) Parametric algorithms for cyclic scheduling problems with applications to robotics, Lecture Notes in Computer Science, vol. 5317, 653-663.
  13. E. Levner, D. Alcaide and J. Ganoulis. (2008) Risk management of transboundary water resources using the green supply chain approach, International Journal of Risk Assessment and Management, 10(4), 357-372.
  14. V.Kats, L.Lei, and E. Levner. (2008) Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence and time-window constraints, European Journal of Operational Research, 187(3), 1196-1211.
  15. E. Levner, D. Pinto, P. Rosso, D. Alcaide and R.R.K. Sharma. (2007) Fuzzifying clustering algorithms: The case study of MajorClust, Lecture Notes in Artificial Intelligence, v. 4827, pp. 821-830.
  16. E. Levner, D.Alcaide and J. Sicilia. (2007) Multi-attribute text classification using fuzzy Borda method and semantic grades, Lecture Notes in Artificial Intelligence, v. 4578, 422-429.

Profile Details

NULL

Free SCIRP Newsletters
Copyright © 2006-2024 Scientific Research Publishing Inc. All Rights Reserved.
Top